7000
Comment:
|
8374
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
Line 6: | Line 5: |
. Chief: R. Takahashi(ICRR) . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR) ---- == Weekly EVO Meeting == . Every Wednesday, 21:00(JST) |
. Chief: R. Takahashi (NAOJ) . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) ---- == VIS Meeting == . Every Friday, from 13:30 (JST) . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] ---- == Design == [[KAGRA/Subgroups/VIS/TypeA|Type-A]] Type-B [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] Type-C [[KAGRA/Subgroups/VIS/Payload|Payload]] iKAGRA TM ---- == Installation == . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]] . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]] ---- == Operation == . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] ---- == Old Weekly EVO Meeting == . This meeting is suspended. [[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]] === The 31th (12 September, 2012) === . [[attachment:KAGRAvi_minute_2012Sep12.txt|Minute]] === The 30th (5 September, 2012) === . [[attachment:KAGRAvi_minute_2012Sep05.txt|Minute]] === The 29th (29 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug29.txt|Minute]] === The 28th (22 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug22.txt|Minute]] === The 27th (15 August, 2012) === . No meeting (summer vacation) === The 26th (8 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug08.txt|Minute]] === The 25th (1 August, 2012) === . [[attachment:KAGRAvi_minute_2012Aug01.txt|Minute]] |
Line 25: | Line 78: |
Line 27: | Line 79: |
Line 29: | Line 80: |
Line 34: | Line 84: |
Line 49: | Line 98: |
Line 57: | Line 105: |
Line 132: | Line 179: |
Line 136: | Line 182: |
. [[LCGT/subgroup/vis/tama_sas|Item list to be improved]] | . [[KAGRA/Subgroups/VIS/FEM/tama_sas|Item list to be improved]] |
Line 151: | Line 197: |
. [[LCGT/subgroup/vis/FEM|FEM Page]] | . [[KAGRA/Subgroups/VIS/FEM|FEM Page]] |
Contents
- Vibration Isolation
- VIS Meeting
- Design
- Installation
- Operation
-
Old Weekly EVO Meeting
- The 31th (12 September, 2012)
- The 30th (5 September, 2012)
- The 29th (29 August, 2012)
- The 28th (22 August, 2012)
- The 27th (15 August, 2012)
- The 26th (8 August, 2012)
- The 25th (1 August, 2012)
- The 24th (28 September, 2011)
- The 23th (15 September, 2011)
- The 22th (7 September, 2011)
- The 21th (31 August, 2011)
- The 20th (24 August, 2011)
- The 19th (10 August, 2011)
- The 18th (27 July, 2011)
- The 17th (20 July, 2011)
- The 16th (13 July, 2011)
- The 15th (6 July, 2011)
- The 14th (29 June, 2011)
- The 13th (22 June, 2011)
- The 12th (15 June, 2011)
- The 11th (8 June, 2011)
- The 10th (1 June, 2011)
- The 9th (25 May, 2011)
- The 8th (18 May, 2011)
- The 7th (11 May, 2011)
- The 6th (27 April, 2011)
- The 5th (20 April, 2011)
- (11 April, 2011)
- The 4th (6 April, 2011)
- The 3rd (30 March, 2011)
- The 2nd (23 March, 2011)
- The 1st (16 March, 2011)
- LCGT防振系作業部会(2009)
- Archive
Vibration Isolation
- Chief: R. Takahashi (NAOJ)
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
VIS Meeting
- Every Friday, from 13:30 (JST)
Design
Type-B
Type-C
iKAGRA TM
Installation
Operation
Old Weekly EVO Meeting
- This meeting is suspended.
The 31th (12 September, 2012)
The 30th (5 September, 2012)
The 29th (29 August, 2012)
The 28th (22 August, 2012)
The 27th (15 August, 2012)
- No meeting (summer vacation)
The 26th (8 August, 2012)
The 25th (1 August, 2012)
The 24th (28 September, 2011)
The 23th (15 September, 2011)
The 22th (7 September, 2011)
The 21th (31 August, 2011)
The 20th (24 August, 2011)
The 19th (10 August, 2011)
The 18th (27 July, 2011)
The 17th (20 July, 2011)
The 16th (13 July, 2011)
The 15th (6 July, 2011)
The 14th (29 June, 2011)
The 13th (22 June, 2011)
The 12th (15 June, 2011)
The 11th (8 June, 2011)
The 10th (1 June, 2011)
The 9th (25 May, 2011)
The 8th (18 May, 2011)
The 7th (11 May, 2011)
The 6th (27 April, 2011)
The 5th (20 April, 2011)
(11 April, 2011)
The 4th (6 April, 2011)
The 3rd (30 March, 2011)
The 2nd (23 March, 2011)
The 1st (16 March, 2011)
LCGT防振系作業部会(2009)
第6回
- 11月12日(木) 15:00-16:30 天文台輪講室
第5回
10月15日(木) 13:00-14:30 天文台大会議室 (議事録)
ブレーンストーミング
第4回
9月3日(木) 15:00-16:30 天文台輪講室 (議事録)
第3回
8月6日(木) 15:00-16:30 天文台輪講室 (議事録)
第2回
7月16日(木) 15:00-16:30 天文台輪講室 (議事録)
第1回
6月3日(水) 17:00-19:00 天文台輪講室 (議事録)
R&Dについて (次回)
Archive
TAMA SAS
TAMA Double Pendulum
Seismic spectrum in Kamioka mine
In loud day (This data should be used as nominal ground motion in Kamioka)
LCGT-SAS model
Transfer function X0~X7/Xg (old)
Modeling M-file (2009/8/15)(2009/8/17)
Spectrum of displacement (2009/8/15)(2009/8/17)
Finite Element Analysis