939
Comment:
|
1352
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
|| '''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] || |
## page was renamed from LCGT/subgroup/vis |
Line 5: | Line 4: |
== 防振系 == | == Vibration Isolation == . Chief: R. Takahashi (NAOJ) . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) |
Line 7: | Line 9: |
常温防振+ヒートリンク+低温懸架 | ---- == VIS Meeting == . Every Friday, from 13:30 (JST) . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] |
Line 9: | Line 14: |
リーダー: 高橋竜太郎 (NAOJ) <<BR>> | ---- == Design == [[KAGRA/Subgroups/VIS/TypeA|Type-A]] |
Line 11: | Line 18: |
サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR) | [[KAGRA/Subgroups/VIS/TypeB|Type-B]] |
Line 13: | Line 20: |
[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] | |
Line 14: | Line 22: |
=== TAMA SAS の問題点 === . [[LCGT/subgroup/vis/tama_sas|List to be improved]] |
[[KAGRA/Subgroups/VIS/Type-C|Type-C]] |
Line 17: | Line 24: |
=== 第1回LCGT防振系作業部会 === | [[KAGRA/Subgroups/VIS/Payload|Payload]] |
Line 19: | Line 26: |
6月3日(水) 17:00-19:00 天文台輪講室 | [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]] |
Line 21: | Line 28: |
[[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] | ---- == Installation == . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]] . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]] |
Line 23: | Line 33: |
[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) | . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]] ---- == Operation == . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] |
Line 25: | Line 38: |
[[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]] | ---- == Archives == . [[KAGRA/Subgroups/VIS/Photos|Photos]] |
Line 27: | Line 42: |
R&Dについて | ---- == Old Weekly EVO Meeting == . This meeting is suspended. [[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]] |
Contents
Vibration Isolation
- Chief: R. Takahashi (NAOJ)
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
VIS Meeting
- Every Friday, from 13:30 (JST)
Design
Installation
Operation
Archives
Old Weekly EVO Meeting
- This meeting is suspended.