Results 201 - 225 of 438 results out of about 36087 pages. (5.35 seconds)
- KAGRA/Subgroups/CAL/GstLAL/tutorials/step1 . . . 8 matches
- ...urn.SUCCESS:
raise RuntimeError("pipeline could not be set to NULL")
}}}
* [[KAGRA/Subgroups/CAL/GstLAL/tutorials/step2|(Next) Step 2: Dump lock flags from a frame cache...
- KAGRA/Subgroups/CAL/GstLAL/tutorials/step0 . . . 8 matches
- ...K1_C 1209288384 32 file://localhost/data/full/12092/K-K1_C-1209288384-32.gwf
}}}
* [[KAGRA/Subgroups/CAL/GstLAL/tutorials/step1|(Next) Step 1: Use GstLAL in your python script]]...
- KAGRA/Subgroups/VIS/VISMinutes20181221 . . . 7 matches
- ...en recorded in a safe.snap file, which we fixed.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20181214 . . . 7 matches
- ...irapro installed a bellows on the -Y side of SR3.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20180921 . . . 7 matches
- ...r SR2.
===== SRM =====
* Continue installation.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20180831 . . . 7 matches
- ....
* Setting of controls.
=== Type B (Mark) ===
==== Report for week of 8/13 ====
* KAGRA was closed Mon/Tue 8/13-14 due to Obon.
* Enzo and team investigated an issue with th...
- KAGRA/Subgroups/VIS/VISMinutes20180810 . . . 7 matches
- ...on't be able to check the result until after Obon.
==== Plan for week of 8/13 ====
* KAGRA closed Mon, Tue.
* Mark on vacation Mon-Thu, then Mitaka on Friday.
* Enzo, Fabian, ...
- KAGRA/Subgroups/VIS/VISMinutes20180803 . . . 7 matches
- ...ms, flags.
* Reconfigure, align assembly frame.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20180601 . . . 7 matches
- ...of SR3 assembly frame.
* Move F0 #3 behind SR3.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20180525 . . . 7 matches
- ...R3.
* Make LBB blade sets (or at least 3 of 9).
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20170602 . . . 7 matches
- ... Sato-san's cable spreadsheet.
==== Plan for coming weeks ====
For more detail, see [[KAGRA/Subgroups/VIS/TypeB/ToDo]].
Week of 6/6:
* Cabling:
* Finish moving in-air cabling...
- KAGRA/Subgroups/VIS/VISMinutes20170414 . . . 7 matches
- ...and correcting minor mistakes.
==== Plan for coming weeks ====
For more detail, see [[KAGRA/Subgroups/VIS/TypeB/ToDo]].
Week of 4/17:
* Install temporary ballast mass in SF.
...
- KAGRA/Subgroups/VIS/VISMinutes20161223 . . . 7 matches
- ... Updated''')
=== Type-A (Takahashi) ===
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]]
* Transportation: The second ...
- KAGRA/Subgroups/VIS/VISMinutes20160520 . . . 7 matches
- ...edule [[https://www.dropbox.com/s/zbhhxlyd79sqe1w/VIS-2016-04-15.pdf?dl=0|chart]].
= iKAGRA related activities =
== PR3 ==
* PR3 post-run work status (Shoda)
* Planned works
...
- KAGRA/Subgroups/VIS/VISMinutes20160226 . . . 7 matches
- ...n control tuning
* Thu:Suspenion control tuning
* Fri: Suspenion control tuning
== iKAGRA ETM suspension ==
* Current status (Ohishi)
* All the suspensions are in the vacuum...
- KAGRA/Subgroups/PEM/Monitors . . . 7 matches
- ...preamp designed and generated by Araya-san, [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/PEMinjection/bKAGRA-phase1?action=AttachFile&do=view&target=acc_amp18020...
- KAGRA/Subgroups/PEM/Meeting/SEIS . . . 7 matches
- ...== Seismic motion meeting ==
=== Motivation ===
* Evaluate the KAGRA ground motion by multi-experiments
* Evaluate the underground experimental area
* Call ideas/experiment...
- KAGRA/Subgroups/PEM/Meeting/200320/Minute . . . 7 matches
- ...sity, frequency)
* PEM tasks in March
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/MAR2020|task list]]
* PRM booth MICを常設にしませんか? (IOO1 BNC ch11かch12で)
=...
- KAGRA/Subgroups/PEM/Meeting/200320/Agenda . . . 7 matches
- ...sity, frequency)
* PEM tasks in March
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/MAR2020|task list]]
* PRM booth MICを常設にしませんか? (IOO1 BNC ch11かch12で)
=...
- KAGRA/Subgroups/PEM/Meeting/190730/Minute . . . 7 matches
- ...ka, Washimi, Kozakai, Fujikawa, Kaihotsu, Mori
=== Agenda ===
* General issue
* KAGRA F2F meeting
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2019Augus...
- KAGRA/Subgroups/IOO/Meeting/Meeting20190513 . . . 7 matches
- ... still be the contact person to Wuhan, Niigata and other collaborating institutes
* [[KAGRA/Subgroups/IOO/Members2017|2019 IOO Membership confirmed]]
* [[KAGRA/Subgroups/IOO/Lig...
- KAGRA/Subgroups/DGS/Meeting/20180920/minute . . . 7 matches
- ...
= LIGO-KAGRA CDS meeting - 6/21 8am (JST), 6/20 6pm (LLO) =
== Connection Info ==
[[KAGRA/Subgroups/DGS/Meeting/LKAccess|Teamspeak]] (password protected page. KAGRA wiki a...
- KAGRA/Subgroups/DET/TaskList . . . 7 matches
- ...= DetChar Task List =
== 2024 ==
Discussed on ''[[KAGRA/Subgroups/DET/Meeting#A20240228_.28Wed..29|Feb. 28, 2024]]'' (See also [kagra-detchar 02425])
=== Task List ===
1. Comm...
- KAGRA/Subgroups/DET/Meeting/LVK0612 . . . 7 matches
- ...= LVK Detchar Meeting =
* ligo.org Teamspeak Detchar channel [[KAGRA/Subgroups/DGS/Meeting/LKAccess|Teamspeak]]
* June 11th 8.00am PT / 11.00am ET / 5.00pm CET / June 12th 12am...
- KAGRA/Subgroups/AOS/DCQPDDriverList . . . 7 matches
- ...cument?docid=2087|JGW-D1302087]]), as known as Oplev QPD Driver, or 15 pin UWF.
See [[KAGRA/Subgroups/AOS/DCQPDList|DCQPDList page]] for the list of DC QPDs.
||JGW SN ||Version |...