Differences between revisions 1 and 2
Revision 1 as of 2022-05-30 21:32:57
Size: 364
Editor: YoichiAso
Comment:
Revision 2 as of 2022-06-01 12:49:23
Size: 407
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
 * Site survey measurements: Aso
 * KIW9

KAGRA Filter Cavity Meeting 2022/6/1

Date/Time: 2022/6/1 13:00 - 14:00

Connection: KAGRA Zoom2 (https://zoom.us/j/6676627462)

Agenda

  • Scattered Light from OPO: Michael
  • Site survey measurements: Aso
  • KIW9
  • Status reports
    • Overall design: Matteo
    • Filter Cavity: Marc
    • FIS design: Yuhang
    • Interface Optics: Huali
    • Filter Cavity Control: Aritomi, Michael

KAGRA/Upgrades/PostO4Upgrades/FilterCavity/Meetings/20220601 (last edited 2022-06-01 14:46:37 by huali.chen)