Differences between revisions 1 and 12 (spanning 11 versions)
Revision 1 as of 2023-04-03 11:19:40
Size: 387
Editor: YoichiAso
Comment:
Revision 12 as of 2023-04-05 03:40:12
Size: 426
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= KAGRA Filter Cavity Meeting 2023/4/4 =

Date/Time:  2023/4/4  16:00 - 17:00
KAGRA Filter Cavity Meeting 2023/4/4
Date/Time: 2023/4/4 16:00 - 17:00
Line 7: Line 5:
== Agenda == Agenda
FC suspension development status: Aso Slides (https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14894)
Line 9: Line 8:
 * FC suspension development status: Aso

 *
Status reports
  * Overall design: Matteo
  * FC design: Marc 
  * Squeezer Design: Michael
  * Interface Optics: Huali 
  * OPO: Hsun-Chung Wu
  * Faraday Isolator: June Gyu 
Status reports
Overall design: Matteo
FC design: Marc
Squeezer Design: Michael
Interface Optics: Huali
OPO: Hsun-Chung Wu
Faraday Isolator: June Gyu

KAGRA Filter Cavity Meeting 2023/4/4 Date/Time: 2023/4/4 16:00 - 17:00 Connection: KAGRA Zoom2 (https://zoom.us/j/6676627462)

Agenda FC suspension development status: Aso Slides (https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14894)

Status reports Overall design: Matteo FC design: Marc Squeezer Design: Michael Interface Optics: Huali OPO: Hsun-Chung Wu Faraday Isolator: June Gyu

KAGRA/Upgrades/PostO4Upgrades/FilterCavity/Meetings/20230404 (last edited 2023-04-15 23:02:36 by YoichiAso)