KAGRA/subgroup/AOS/TMS-VIS0について、ここに記述してください。 | = Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS) = * With a fixed stage. * TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope) ||<<MonthCalendar(,2018,5)>>||<<MonthCalendar(,2018,6)>>|| == Links to knowledge == * == LVDTs == * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5022]] == Actuator coils == * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5014]] == Geophones == == Task list == {{{#!wiki green/solid Note: some of the tasks can be done in parallel. }}} * Place/install the fixed stage. * Needs some shims... but what is the required horizontalness? * Place/install the BRT * What is the references...? == Signal Assign == ||Pin Name||Resistance|| Equipment || Assign || Comment1 || Comment2 || Connection || |
Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)
- With a fixed stage.
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
|
|
Links to knowledge
LVDTs
Actuator coils
Geophones
Task list
Note: some of the tasks can be done in parallel.
- Place/install the fixed stage.
- Needs some shims... but what is the required horizontalness?
- Place/install the BRT
- What is the references...?
Signal Assign
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |