Differences between revisions 3 and 4
Revision 3 as of 2018-05-16 13:07:56
Size: 637
Comment:
Revision 4 as of 2018-05-16 13:09:49
Size: 790
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
 } [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3009]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3103]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3323]]

Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)

  • With a fixed stage.
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

<< <  2018 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  

LVDTs

Actuator coils

Geophones

Task list

Note: some of the tasks can be done in parallel.

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

KAGRA/subgroup/AOS/TMS-VIS0 (last edited 2018-10-24 19:00:52 by TomotadaAkutsu)