Differences between revisions 31 and 32
Revision 31 as of 2018-07-06 19:31:55
Size: 3277
Comment:
Revision 32 as of 2018-07-06 19:35:31
Size: 3302
Comment:
Deletions are marked like this. Additions are marked like this.
Line 39: Line 39:
|| 404080976 || Vert || || || 404080976 || Vert || GeoV2||
Line 43: Line 43:
|| 404084241 || Vert || || || 404084241 || Vert || GeoV3||
Line 45: Line 45:
|| 2 || Horiz|| || || 2 || Horiz|| GeoH3||
Line 47: Line 47:
|| 4 || Horiz|| ||
|| 5 || Horiz|| ||
|| 4 || Horiz|| GeoH1||
|| 5 || Horiz|| GeoH2||

Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)

  • With a fixed stage.
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

<< <  2018 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  

LVDTs

Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below for #1 and #2, as I needed to once detach the pins when I installed the LVDTs (Akutsu).

Actuator coils

Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below, as I needed to once detach the pins when I installed the coils (Akutsu).

Geophones

Serical# of L-4C

Vert/Horiz

Naming of the assembled unit

404080975

Vert

404080976

Vert

GeoV2

404080977

Vert

404080978

Vert

404084240

Vert

404084241

Vert

GeoV3

404084242

Vert

2

Horiz

GeoH3

3

Horiz

4

Horiz

GeoH1

5

Horiz

GeoH2

15

Horiz

16

Horiz

17

Horiz

Cabling

  • LVDT/Act - (coil wires) - Dsub9M - (Dsub9F - PTFE 2m - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
  • Geophone - (MIL C 26482 - PTFE 0.5m - Dsub9M) - (Dsub9F - 1.5m PTFE - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
  • PTFE cables

Task list

Note: some of the tasks can be done in parallel.

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

KAGRA/subgroup/AOS/TMS-VIS0 (last edited 2018-10-24 19:00:52 by TomotadaAkutsu)