Transmission Monitor (TMS) at EXT (Phase 1)

  • With a fixed stage.
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30            

<< <  2018 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the fixed stage.
    • Needs some shims... but what is the required horizontalness?
  • Place/install the BRT
    • What is the references...?

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection