= 20180621 =
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5343]]

== Today's activities ==
Workers: Akutsu, Simon, Ken Tanaka
 * Unpacked the wooden box and took out the WAB by the aid of crane.
 * Brought the WAB into the clean booth for IXC; located on a desk.
 * Checked oblique of the breadboard in IXC.
 * Installed the WAB traverser and checked the oblique as well.
 * Found the magnets on the dampers were moved probably during the transportation; fixed them.
 * Issue: don't know what should be the references for installation and design... actually those parts are why KAGRA's installation work is so slow!!! F*cking interfacing!!!

== Next plan ==
 * Install the WAB in IXC.
 * Check heights of several points.
 * Check the balance of the suspended WAB.
 * Test the WAB traverser with the WAB.

== Wanted! ==