## page was renamed from Minutes20120717 = MIF Meeting Minutes 2012/7/17 = == Decisions == The task assignment was decided as follows: * LSC ASC Overall Design (Aso, Michimura, (Nakano ?)) * Frequency Stabilization Servo (Ando) * Green Lock System (Tatsumi, Ueda) * RTS code implementation(Miyakawa) * Commissioning Planning (Aso) * Electronics Circuit Design (Aso) * Vacuum Enclosure & Wiring for In-Vac PDs (Akutsu, Yamamoto) * PD Protection Shutter (Somiya, Akutsu) * Beam handling during All-In-Vac operation (Akutsu) * Output Mode Cleaner (Somiya, Michimura, Arai) See [[KAGRA/Subgroups/MIF/TaskList]] for more details. == Next meeting == Proposed date: 8/7(Tue) 13:30 - 14:30 (To be fixed) Agenda: Progress reports of the tasks.