= MIF Meeting 2013/2/26 = === Date/Location === 2013/2/26, !SeeVogh === Participants === Aso, Yamamoto, Somiya, Nakano, Takahashi, Akutsu, Shibata === Fast beam shutter === * The first prototype was made at Somiya Lab. by Ueda-kun and Tobias. The initial test yielded less than 1msec shut down time. (The shutter was 1mm away from the center of the beam) * Larger separation from the beam center is necessary to avoid scattering by the shutter blade (roughly 1cm). Bigger capacitor is necessary. * The prototype system exploded and currently it is not usable. * Cost to make one is less than 10000JPY. * We need to estimate the maximum amount of power falling onto the PDs. * Is it possible to just shutting down the beam at the output of the laser. === Vacuum enclosure === * Cosmotec is expensive * Contact the company making the aLIGO's PD enclosures === Suspension Modeling === * Checked the validity of the methodology by constructing a double pendulum model and comparing it with the hand solved analitic formula. They agreed well. * Needs better filters to realize true damping. * Construct a rigid body double-pendulum model next. * Then construct a Type-B payload only model. === KAGRA de-scoping related === ===== Inferior suspension ===== * Length requirement is OK for PRC * ASC requirement has to be checked ===== No Green Lock ===== * Digital Interferometry (Nikhef) ===== No OMC ===== * Noise calculation with RF ===== No BRT ===== * Not an option. Needs more discussion * How to extract the transmission beam if there is no iKAGRA ETM chamber. == A/I == * Ask Nishida-san to work on the estimation of the maximum power falling on the PDs using e2e (Somiya) * Construct rigid body models of suspensions (Nakano) * Contact the company making the aLIGO's PD enclosures (Akutsu) * Alignment noise requirement for PRC/SRC mirrors * RF DARM noise (Aso) * Further discussion of BRT (Akutsu)