= Minutes of ISC Meeting on 2015/7/27 = 14:00 - 15:00 on SeeVogh Participants: Aso, Miyakawa, Kokeyama, Somiya, Arai, H. Yamamoto, Ueda, Nakano, Akutsu, Michimura == Agenda == 1. Review the task list again 1. Confirmation of available man power == Discussions == === Review of the task list again === * ISC Task List 2015 (Updated after the meeting) http://www.evernote.com/l/AGHCMq59o25EKK0TsfE3RgA6FfhobJlq7QE/ ==== Comments ==== * iKAGRA commissioning: * Need to be prepared befoe starting the commissioning. * We should make a noise budget model beforehand. * Also we should perform necessary measurements (such as PD dark noise) as much as possible beforehand. * IBF: * Only considering the power reduction of the RFSB is not enough. We should estimate the actual impacts on the loop noise, ASC, etc. * We should check with Hirose-san how much assymmetry between X and Y arms were introduced with his simulations. * We now have more mirror maps including BS. Should be able to perform more realistic simulations. * There was a bug in the SIS code. Should re-run the simulations. * Ask Hirose-san for the mirror maps. * OMC requirements * KAGRA cannot remove the power term of the substrate transmition by a ring heater. Should expect more HOM power from the power term. * OMC suspensions * Talking with UWA. Also NIKHEF is a possibility. * Beam dumpers * We should be prepared for the beam dumps when some of the mirrors are mis-aligned during the alignment works * bKAGRA commissioning * Aso will send some slides. When to go to cryogenic ? === Man Power === * Aso will talk with the leader of each research group about their efforts for the ISC tasks. * Aso will personally contact people for task assignment * JANGO would like to be assigned tasks in big chunks