Differences between revisions 1 and 2
Revision 1 as of 2015-10-06 05:35:26
Size: 1742
Editor: YoichiAso
Comment:
Revision 2 as of 2015-10-06 09:21:09
Size: 1742
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
  * Ando-lab students will come around Oct. 13. Will ask them to complete the above one.   * Ando-lab students will come around Oct. 26. Will ask them to complete the above one.
Line 20: Line 20:
  * Ando-lab people will work on it around Oct. 13   * Ando-lab people will work on it around Oct. 26

Minutes of the ISC Meeting on 2015/10/5

14:00 - 15:00 @ SeeVogh

Participants: Miyakawa, Aso, Michimura, H. Yamamoto, Arai, Raffaele, Akutsu

Confirmation of the electronics preparation status (Michimura)

  • Power Supply of DC PD
    • Use AC adaptors for iKAGRA. For bKAGRA, we will consider making dropper type DC supply.
  • Differential to single end converter
    • There is one unfinished circuit in CLIO.
    • Ando-lab students will come around Oct. 26. Will ask them to complete the above one.
  • RF Patch Panels
    • Already ordered
    • Conectors must be purchased soon.
  • Cable layout
    • Confirm the actual rack locations on Oct. 13 - 16. (Michimura and Miyakawa)
  • TTFSS pull up
    • We know what to do
    • Ando-lab people will work on it around Oct. 26

Comments

  • Thorlabs PZT driver accepts only mono pole input
    • May need to add analog sum amplifiers. (LIGO did it)

Commissioning schedule (Aso)

  • The updated task list is being entered into the MIF MS project file
  • Aso will circulate the draft version for discussion soon.

Updates on the simulation (Hirose) and output optics design (Somiya)

  • Hirose-san's report

  • H. Yamamoto will come to Kamioka from Oct. 13 to 16. Some preliminary numbers will be available then.
  • ITM transmission data is the missing piece. If we use the GT&T crystals, then we have to wait for the ETM transmission map.

  • If Shinko-sha crystal is good, we will have the transmission data sooner.

AOB

  • Rules for view port protection are considered serious in LIGO. We will need similar ones in KAGRA.

Next Meeting

Oct. 19(Mon) 14:00 - 15:00