= Minutes of the ISC Meeting on 2015/10/5 = 14:00 - 15:00 @ SeeVogh Participants: Miyakawa, Aso, Michimura, H. Yamamoto, Arai, Raffaele, Akutsu == Confirmation of the electronics preparation status (Michimura) == * Power Supply of DC PD * Use AC adaptors for iKAGRA. For bKAGRA, we will consider making dropper type DC supply. * Differential to single end converter * There is one unfinished circuit in CLIO. * Ando-lab students will come around Oct. 26. Will ask them to complete the above one. * RF Patch Panels * Already ordered * Conectors must be purchased soon. * Cable layout * Confirm the actual rack locations on Oct. 13 - 16. (Michimura and Miyakawa) * TTFSS pull up * We know what to do * Ando-lab people will work on it around Oct. 26 === Comments === * Thorlabs PZT driver accepts only mono pole input * May need to add analog sum amplifiers. (LIGO did it) == Commissioning schedule (Aso) == * The updated task list is being entered into the MIF MS project file * Aso will circulate the draft version for discussion soon. == Updates on the simulation (Hirose) and output optics design (Somiya) == * Hirose-san's [[KAGRA/subgroup/ifo/MIF/Minutes20151005/HiroseReport20151005|report]] * H. Yamamoto will come to Kamioka from Oct. 13 to 16. Some preliminary numbers will be available then. * ITM transmission data is the missing piece. If we use the GT&T crystals, then we have to wait for the ETM transmission map. * If Shinko-sha crystal is good, we will have the transmission data sooner. == AOB == * Rules for view port protection are considered serious in LIGO. We will need similar ones in KAGRA. == Next Meeting == Oct. 19(Mon) 14:00 - 15:00