= ISC Meeting on 2015/11/30 = 14:00 - 15:15 on SeeVogh Participants: H. Yamamoto, Michimura, Aso, Akutsu, Okutomi, Hirose, Somiya 1. Requests for coating requirements from LMA (Aso) * We got requests to relax requirments for coating of various mirrors from LMA. * The following changes will be made 1. Green transmission for TMs * Finesse of the arm for green should be higher than 6 to avoid unwanted resonances of higher order modes. For safety, we decided to make it 50. With the relaxed transmission error, the finesse will be in the range of 40 - 60, which is still fine. * Old: 6% +/- 0.5% * New: 6% +/- 1% 1. ITM AR reflectivity * ITM AR reflection will be used as POX and POY. Therefore, we need non-zero reflectivity. The PRC cavity can tolerate a loss of 1000ppm. * Old: 200ppm +100/-0 * New: 300ppm +/-100ppm 1. ETM AR reflectivity * The ghost beam from the ETM AR will be separated inside the BRT when the beam size becomes small. * Old: <50ppm * New: < 100ppm * Reference: LIGO requirement is < 500ppm. Actually measured value vary a lot from 20ppm to 700ppm. * The difference between 50ppm and 100ppm is insignificant 1. PRM/SRM AR reflectivity * Separation of the PRM ghost beam was not yet considered. * Old: < 50ppm * New: < 100ppm 1. SRM HR transmission * Old: 15.36% +/-0.1% * New: 15%+/-1% * The linear range of the SRCL signal is fine with this relaxed error range. * The WFS shot noise change only about 5% with the above error. * Somiya-san will check the effect on the sensitivity. 1. Electronics Preparation Status (Michimura, Aso) * Cable (Michimura) * Delivered to the site. Now in the tunnel (低温機械室) * RF flexible cables are also included, but some RF flexible cables are in NAOJ room at Kamioka. * See [[https://docs.google.com/spreadsheets/d/1VPkv64gDrbhSX4LiO5aNc-miSf3h3pl1dRQPKUhnuCs/|this ISC cable list]]. * RF distribution (Komori, Michimura) * The panel should have been delivered to Kamioka * Need to arrange people to assemble the box * RFPD/QPD (Aso, Doi) * The first delivery will be in the middle of Dec. * For MC lock, we need one extra RFPD. We have the stuffed PCB but no box. Fujisawa-san at Toyama University is now making a box. Asked Doi-san to supervise her and finish the box production by the end of the week of 11/30. * Diff-to-Single converter * For bKAGRA, we need to make official converters. * For iKAGRA, we can use a passive conversion boxes. Just connect the cold line to GND through a resistor (1kOhm or so). * The above box needs to be made 1. Magnet Noise (Michimura) * Decided to reduce the size of BS magnets by a factor of 30 from the current design. IM magnets will also be smaller (1/3 to 1/10). * VIS members (Mark and Fabian) will design new flags for the BS and SR 1. OMC (Somiya) * We need to decide where to level the beam in the output chain: Befoer OFI ?, after OFI ? * Do we need steering mirrors before OFI ? -> Needs to be discussed with quantitative assesment of scattering noise from various optical components. * How much light power will be picked off for the AS WFS ? -> 1% 1. FFT Simulation (Hirose, H. Yamamoto) * No update