ISC Meeting on 2015/11/30

14:00 - 15:15 on SeeVogh

Participants: H. Yamamoto, Michimura, Aso, Akutsu, Okutomi, Hirose, Somiya

  1. Requests for coating requirements from LMA (Aso)
    • We got requests to relax requirments for coating of various mirrors from LMA.
    • The following changes will be made
      1. Green transmission for TMs
        • Finesse of the arm for green should be higher than 6 to avoid unwanted resonances of higher order modes. For safety, we decided to make it 50. With the relaxed transmission error, the finesse will be in the range of 40 - 60, which is still fine.
        • Old: 6% +/- 0.5%
        • New: 6% +/- 1%
      2. ITM AR reflectivity
        • ITM AR reflection will be used as POX and POY. Therefore, we need non-zero reflectivity. The PRC cavity can tolerate a loss of 1000ppm.
        • Old: 200ppm +100/-0
        • New: 300ppm +/-100ppm
      3. ETM AR reflectivity
        • The ghost beam from the ETM AR will be separated inside the BRT when the beam size becomes small.
        • Old: <50ppm

        • New: < 100ppm

        • Reference: LIGO requirement is < 500ppm. Actually measured value vary a lot from 20ppm to 700ppm.

        • The difference between 50ppm and 100ppm is insignificant
      4. PRM/SRM AR reflectivity
        • Separation of the PRM ghost beam was not yet considered.
        • Old: < 50ppm

        • New: < 100ppm

      5. SRM HR transmission
        • Old: 15.36% +/-0.1%
        • New: 15%+/-1%
        • The linear range of the SRCL signal is fine with this relaxed error range.
        • The WFS shot noise change only about 5% with the above error.
        • Somiya-san will check the effect on the sensitivity.
  2. Electronics Preparation Status (Michimura, Aso)
    • Cable (Michimura)
    • RF distribution (Komori, Michimura)
      • The panel should have been delivered to Kamioka
      • Need to arrange people to assemble the box
    • RFPD/QPD (Aso, Doi)
      • The first delivery will be in the middle of Dec.
      • For MC lock, we need one extra RFPD. We have the stuffed PCB but no box. Fujisawa-san at Toyama University is now making a box. Asked Doi-san to supervise her and finish the box production by the end of the week of 11/30.
    • Diff-to-Single converter
      • For bKAGRA, we need to make official converters.
      • For iKAGRA, we can use a passive conversion boxes. Just connect the cold line to GND through a resistor (1kOhm or so).
      • The above box needs to be made
  3. Magnet Noise (Michimura)
    • Decided to reduce the size of BS magnets by a factor of 30 from the current design. IM magnets will also be smaller (1/3 to 1/10).
    • VIS members (Mark and Fabian) will design new flags for the BS and SR
  4. OMC (Somiya)
    • We need to decide where to level the beam in the output chain: Befoer OFI ?, after OFI ?
    • Do we need steering mirrors before OFI ? -> Needs to be discussed with quantitative assesment of scattering noise from various optical components.

    • How much light power will be picked off for the AS WFS ? -> 1%

  5. FFT Simulation (Hirose, H. Yamamoto)
    • No update