= ISC Meeting on 2015/12/14 = 14:00 - 15:00 on See``Vogh Participants: Arai, Miyakawa, Kokeyama, Aso, Hirose, Michimura 1. Requests for coating requirements from LMA (Aso) * SRM HR transmission: relax the tolerance to T=0.15+/-0.01 * Inspiral Range: * T=14% 155.467Mpc * T=15.36% 153.901Mpc * T=16% 153.163Mpc * Not a big difference: the relaxed tolerance is acceptable. * Hirose already told LMA that the relaxed requirements are acceptable. * Need to update the Wiki 1. Electronics Preparation Status (Michimura, Aso) * Cable (Michimura) * We have all the necessary cables * RF distribution (Komori, Michimura) * The panel should have been delivered to Kamioka -> Found it. * Need to arrange people to assemble the box -> Nakano-kun did it. * RFPD/QPD (Aso, Doi) * There are some problems with the mis-match between the regulator height and the screw holes on the box. -> Will fix the regulator with a plate. Use insulating plates. * Site installation work schedule * We will make a task list. Then assign tasks to people and arrange the schedule. * Michimura will make a task list. * When to install the LSC rack ? Need to coordinate with the duct installation schedule. 1. Magnet Noise (Michimura) * What was the reason for chosing 2mm dia, 3mm long Sm``Co ? * Michimura will summarize the noise estimates with the above magnet size 1. OMC (Somiya) * No update 1. FFT Simulation (Hirose, H. Yamamoto) * No update 1. Next meting 2016/1/12