ISC Meeting on 2016/1/12
14:00 - 15:00 on SeeVogh
Participants:
Agenda
- iKAGRA interferometer configuration change (Aso)
- Requests for coating requirements from LMA
- Quotation status (Hirose)
- Electronics Preparation Status (Michimura, Aso)
- RFPD/QPD (Aso, Doi)
- Site installation work schedule
- We will make a task list. Then assign tasks to people and arrange the schedule.
- Michimura will make a task list.
- Magnet Noise (Michimura)
- OMC (Somiya)
- FFT Simulation (Hirose, H. Yamamoto)
- Next meting 2016/1/25