ISC Meeting on 2016/1/25

14:00 - 15:00 on SeeVogh

Participants:

  1. Schedule for iKAGRA (Aso)
    • Installation of the analog electronics
    • Installation of the detection optics
    • Digital system integration
    • Initial alignment procedure
  2. Electronics Preparation Status (Michimura, Aso)
  3. RF PD (Aso, Doi)
  4. Cable assembly
    • RF low loss cables with N connectors: order status
    • Diff-to-single cables
    • we have purchased all the other ISC cables
  5. Magnet noise
    • Magnetometer requirement(Michimura)
  6. FFT simulation (H. Yamamoto, Hirose)
  7. Next meting 2016/2/16?