Line 7: Line 7:
* MIF membership [Michimura]
* bKAGRA phase 1 optical configuration study [Aso]
 * MIF membership [Michimura]
 * bKAGRA phase 1 optical configuration study [Aso]
Line 14: Line 14:
* bKAGRA phase 1 commissioning plan [Michimura]  * bKAGRA phase 1 commissioning plan [Michimura]
Line 16: Line 16:
* Mirror absorption measurement status (if any) [Hirose]  * Mirror absorption measurement status (if any) [Hirose]

ISC Meeting on 2016/6/13

2016/5/16 14:00 - 15:00

Participants:

Agenda

  • MIF membership [Michimura]
  • bKAGRA phase 1 optical configuration study [Aso]
    • BS angle changes slightly (0.0187 deg) -> OK

    • beam spot on PR3 shifts by 5 mm -> OK

    • move PR2 and PR3 1 cm each to stabilize PRC -> OK

    • HOM structure / LSC / ASC check -> to be done [Michimura]

    • room temperature ETM availability -> ? [Hirose]

  • bKAGRA phase 1 commissioning plan [Michimura]
    • document posted later
  • Mirror absorption measurement status (if any) [Hirose]