Size: 569
Comment:
|
Size: 695
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
* MIF membership [Michimura] * bKAGRA phase 1 optical configuration study [Aso] |
* MIF membership [Michimura] * members replied: [[KAGRA/Subgroups/MIF/Members|Members]] * bKAGRA phase 1 optical configuration study [Aso] |
Line 14: | Line 15: |
* bKAGRA phase 1 commissioning plan [Michimura] | * bKAGRA phase 1 commissioning plan [Michimura] |
Line 16: | Line 17: |
* Mirror absorption measurement status (if any) [Hirose] | * Mirror absorption measurement status (if any) [Hirose] [[LCGT/subgroup/ifo/ISC/Meetings|back to Meetings page]] |
ISC Meeting on 2016/6/13
2016/5/16 14:00 - 15:00
Participants:
Agenda
- MIF membership [Michimura]
members replied: Members
- bKAGRA phase 1 optical configuration study [Aso]
BS angle changes slightly (0.0187 deg) -> OK
beam spot on PR3 shifts by 5 mm -> OK
move PR2 and PR3 1 cm each to stabilize PRC -> OK
HOM structure / LSC / ASC check -> to be done [Michimura]
room temperature ETM availability -> ? [Hirose]
- bKAGRA phase 1 commissioning plan [Michimura]
- document posted later
- Mirror absorption measurement status (if any) [Hirose]