Differences between revisions 1 and 8 (spanning 7 versions)
Revision 1 as of 2016-06-10 15:14:59
Size: 569
Comment:
Revision 8 as of 2016-06-10 15:26:49
Size: 16
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= ISC Meeting on 2016/6/13 =
2016/5/16 14:00 - 15:00

Participants:

== Agenda ==
* MIF membership [Michimura]
* bKAGRA phase 1 optical configuration study [Aso]
  * BS angle changes slightly (0.0187 deg) -> OK
  * beam spot on PR3 shifts by 5 mm -> OK
  * move PR2 and PR3 1 cm each to stabilize PRC -> OK
  * HOM structure / LSC / ASC check -> to be done [Michimura]
  * room temperature ETM availability -> ? [Hirose]
* bKAGRA phase 1 commissioning plan [Michimura]
  * document posted later
* Mirror absorption measurement status (if any) [Hirose]
abandoned page

abandoned page

KAGRA/subgroup/ifo/MIF/Minutes20160610 (last edited 2016-06-10 15:26:49 by YutaMichimura)