* members replied: [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/MIF/Members|Members]] |
ISC Meeting on 2016/6/13
2016/5/16 14:00 - 15:00
Participants:
Agenda
- MIF membership [Michimura]
members replied: Members
- bKAGRA phase 1 optical configuration study [Aso]
BS angle changes slightly (0.0187 deg) -> OK
beam spot on PR3 shifts by 5 mm -> OK
move PR2 and PR3 1 cm each to stabilize PRC -> OK
HOM structure / LSC / ASC check -> to be done [Michimura]
room temperature ETM availability -> ? [Hirose]
- bKAGRA phase 1 commissioning plan [Michimura]
- document posted later
- Mirror absorption measurement status (if any) [Hirose]