Differences between revisions 3 and 4
Revision 3 as of 2016-06-10 15:18:39
Size: 676
Comment:
Revision 4 as of 2016-06-10 15:18:54
Size: 676
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
  * members replied: [[Members|http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/MIF/Members]]   * members replied: [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/MIF/Members|Members]]

ISC Meeting on 2016/6/13

2016/5/16 14:00 - 15:00

Participants:

Agenda

  • MIF membership [Michimura]
  • bKAGRA phase 1 optical configuration study [Aso]
    • BS angle changes slightly (0.0187 deg) -> OK

    • beam spot on PR3 shifts by 5 mm -> OK

    • move PR2 and PR3 1 cm each to stabilize PRC -> OK

    • HOM structure / LSC / ASC check -> to be done [Michimura]

    • room temperature ETM availability -> ? [Hirose]

  • bKAGRA phase 1 commissioning plan [Michimura]
    • document posted later
  • Mirror absorption measurement status (if any) [Hirose]

KAGRA/subgroup/ifo/MIF/Minutes20160610 (last edited 2016-06-10 15:26:49 by YutaMichimura)