= ISC Meeting on 2016/6/13 = 2016/5/16 14:00 - 15:00 Participants: == Agenda == * MIF membership [Michimura] * members replied: [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/MIF/Members|Members]] * bKAGRA phase 1 optical configuration study [Aso] * BS angle changes slightly (0.0187 deg) -> OK * beam spot on PR3 shifts by 5 mm -> OK * move PR2 and PR3 1 cm each to stabilize PRC -> OK * HOM structure / LSC / ASC check -> to be done [Michimura] * room temperature ETM availability -> ? [Hirose] * bKAGRA phase 1 commissioning plan [Michimura] * document posted later * Mirror absorption measurement status (if any) [Hirose] |