Differences between revisions 7 and 8
Revision 7 as of 2016-06-10 15:23:03
Size: 695
Comment:
Revision 8 as of 2016-06-10 15:26:49
Size: 16
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= ISC Meeting on 2016/6/13 =
2016/5/16 14:00 - 15:00

Participants:

== Agenda ==
 * MIF membership [Michimura]
  * members replied: [[KAGRA/Subgroups/MIF/Members|Members]]
 * bKAGRA phase 1 optical configuration study [Aso]
  * BS angle changes slightly (0.0187 deg) -> OK
  * beam spot on PR3 shifts by 5 mm -> OK
  * move PR2 and PR3 1 cm each to stabilize PRC -> OK
  * HOM structure / LSC / ASC check -> to be done [Michimura]
  * room temperature ETM availability -> ? [Hirose]
 * bKAGRA phase 1 commissioning plan [Michimura]
  * document posted later
 * Mirror absorption measurement status (if any) [Hirose]

[[LCGT/subgroup/ifo/ISC/Meetings|back to Meetings page]]
abandoned page

abandoned page

KAGRA/subgroup/ifo/MIF/Minutes20160610 (last edited 2016-06-10 15:26:49 by YutaMichimura)