* bKAGRA phase 1 optical configuration study [Aso] | * bKAGRA phase 1 optical configuration study [Aso]: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=5199|JGW-G1605199]] |
Line 14: | Line 14: |
* initiated Optickle 2 modeling: [[https://granite.phys.s.u-tokyo.ac.jp/trac/LCGT/browser/trunk/mif/KAGRAOptickle/bKAGRAPhase1/|KAGRAOptickle SVN]] (login required) * Optickle (Optickle2) seminar on July 1 [[http://densuke.biz/list?cd=bNJ9WSPSEQNxheCy|densuke]] |
|
Line 15: | Line 17: |
* bKAGRA phase 1 commissioning plan [Michimura] * document posted later * Mirror absorption measurement status (if any) [Hirose] |
* any others? * bKAGRA phase 1 initial alignmet / commissioning plan [Michimura]: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=5274|JGW-T1605274]] * 5 months (2017.5-10) for 300 K PRMI with dummy payload, 1 week (2018.1) for CRYp PRMI before cooling down * seems like we have enough time for ISC * everything should be ready by 2017.5, and most of the commissioning should be done by 2017.10 ---- * bKAGRA optical layout around PRC [Aso] * POY beam is clipped by PR3 optical bench suspension wire * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5261|JGW-T1605261]] (cartoon) * iKAGRA post-run calibration mystery [Aso] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1767|klog #1767]] * mysterious LPF was probably from saturation (is this end of the story?) * Miyo-kun did time delay fitting: [[https://nbviewer.jupyter.org/urls/dl.dropbox.com/s/e7tj2xvc8krdo2w/Post-Run%20MICH%20Calibration.ipynb|Jupyter Notebook]], [[https://www.dropbox.com/sh/alk6mothy435dis/AABeRhaV6RRZ1CfUqnq6bc7ua?dl=0|Files in Dropbox]] * Requirement for the noise of watchdogs for coil drivers [Aso] * Viewport quality for GV between SRM and OMMT [Akutsu] * bKAGRA phase 1 analog electronics request for AEL [Michimura] * Quad IQ Demodulator LSC: 7 for full bKAGRA (5 in stock) * is heating problem solved? [AEL] * Quad IQ Demodulator ASC: 22 for full bKAGRA (0 in stock) * RF Distribution Amplifier: 10 for full bKAGRA (1 handmade in stock) * DC QPD Interface: 8 (+ AOS) for full bKAGRA (20 in stock) -> OK * RF Patch Panel modification (too thick to fasten nuts) [who?] * RF PD modification (Dsub 9pin won't fix tight, breaks easily with single power supply) [Doi?] * single-ended to differential, differential to single-ended: 10 each being prepared by AEL -> OK * bKAGRA ISC cabling [Michimura/Doi] * No reply from Doi-san * Mirror absorption measurement status [Hirose] |
ISC Meeting on 2016/6/13
2016/5/16 14:00 - 15:00
Participants:
Agenda
- MIF membership [Michimura]
members replied: Members
bKAGRA phase 1 optical configuration study [Aso]: JGW-G1605199
BS angle changes slightly (0.0187 deg) -> OK
beam spot on PR3 shifts by 5 mm -> OK
move PR2 and PR3 1 cm each to stabilize PRC -> OK
HOM structure / LSC / ASC check -> to be done [Michimura]
initiated Optickle 2 modeling: KAGRAOptickle SVN (login required)
Optickle (Optickle2) seminar on July 1 densuke
room temperature ETM availability -> ? [Hirose]
- any others?
bKAGRA phase 1 initial alignmet / commissioning plan [Michimura]: JGW-T1605274
- 5 months (2017.5-10) for 300 K PRMI with dummy payload, 1 week (2018.1) for CRYp PRMI before cooling down
- seems like we have enough time for ISC
- everything should be ready by 2017.5, and most of the commissioning should be done by 2017.10
- bKAGRA optical layout around PRC [Aso]
- POY beam is clipped by PR3 optical bench suspension wire
JGW-T1605261 (cartoon)
- iKAGRA post-run calibration mystery [Aso]
- mysterious LPF was probably from saturation (is this end of the story?)
Miyo-kun did time delay fitting: Jupyter Notebook, Files in Dropbox
- Requirement for the noise of watchdogs for coil drivers [Aso]
- Viewport quality for GV between SRM and OMMT [Akutsu]
- bKAGRA phase 1 analog electronics request for AEL [Michimura]
- Quad IQ Demodulator LSC: 7 for full bKAGRA (5 in stock)
- is heating problem solved? [AEL]
- Quad IQ Demodulator ASC: 22 for full bKAGRA (0 in stock)
- RF Distribution Amplifier: 10 for full bKAGRA (1 handmade in stock)
DC QPD Interface: 8 (+ AOS) for full bKAGRA (20 in stock) -> OK
- RF Patch Panel modification (too thick to fasten nuts) [who?]
- RF PD modification (Dsub 9pin won't fix tight, breaks easily with single power supply) [Doi?]
single-ended to differential, differential to single-ended: 10 each being prepared by AEL -> OK
- Quad IQ Demodulator LSC: 7 for full bKAGRA (5 in stock)
- bKAGRA ISC cabling [Michimura/Doi]
- No reply from Doi-san
- Mirror absorption measurement status [Hirose]