Differences between revisions 1 and 2
Revision 1 as of 2016-06-10 15:26:06
Size: 695
Comment:
Revision 2 as of 2016-06-10 15:28:06
Size: 712
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
  * any others?

ISC Meeting on 2016/6/13

2016/5/16 14:00 - 15:00

Participants:

Agenda

  • MIF membership [Michimura]
  • bKAGRA phase 1 optical configuration study [Aso]
    • BS angle changes slightly (0.0187 deg) -> OK

    • beam spot on PR3 shifts by 5 mm -> OK

    • move PR2 and PR3 1 cm each to stabilize PRC -> OK

    • HOM structure / LSC / ASC check -> to be done [Michimura]

    • room temperature ETM availability -> ? [Hirose]

    • any others?
  • bKAGRA phase 1 commissioning plan [Michimura]
    • document posted later
  • Mirror absorption measurement status (if any) [Hirose]

back to Meetings page

KAGRA/subgroup/ifo/MIF/Minutes20160613 (last edited 2016-07-25 10:30:07 by YutaMichimura)