Size: 1371
Comment:
|
Size: 1371
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 22: | Line 22: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1767|klog #1767]] | |
Line 23: | Line 24: |
* Miyo-kun did time delay fitting: [[Jupyter Notebook|https://nbviewer.jupyter.org/urls/dl.dropbox.com/s/e7tj2xvc8krdo2w/Post-Run%20MICH%20Calibration.ipynb]], [[Files in Dropbox|https://www.dropbox.com/sh/alk6mothy435dis/AABeRhaV6RRZ1CfUqnq6bc7ua?dl=0]] * [[klog #1767|http://klog.icrr.u-tokyo.ac.jp/osl/?r=1767]] |
* Miyo-kun did time delay fitting: [[https://nbviewer.jupyter.org/urls/dl.dropbox.com/s/e7tj2xvc8krdo2w/Post-Run%20MICH%20Calibration.ipynb|Jupyter Notebook]], [[https://www.dropbox.com/sh/alk6mothy435dis/AABeRhaV6RRZ1CfUqnq6bc7ua?dl=0|Files in Dropbox]] |
ISC Meeting on 2016/6/13
2016/5/16 14:00 - 15:00
Participants:
Agenda
- MIF membership [Michimura]
members replied: Members
- bKAGRA phase 1 optical configuration study [Aso]
BS angle changes slightly (0.0187 deg) -> OK
beam spot on PR3 shifts by 5 mm -> OK
move PR2 and PR3 1 cm each to stabilize PRC -> OK
HOM structure / LSC / ASC check -> to be done [Michimura]
room temperature ETM availability -> ? [Hirose]
- any others?
- bKAGRA phase 1 commissioning plan [Michimura]
- document posted later
- bKAGRA optical layout around PRC [Aso]
- POY beam is clipped by PR3 optical bench suspension wire
JGW-T1605261 (cartoon)
- iKAGRA post-run calibration mystery [Aso]
- mysterious LPF was probably from saturation (is this end of the story?)
Miyo-kun did time delay fitting: Jupyter Notebook, Files in Dropbox
- Mirror absorption measurement status (if any) [Hirose]