Differences between revisions 4 and 5
Revision 4 as of 2016-06-10 15:39:45
Size: 1371
Comment:
Revision 5 as of 2016-06-10 15:40:15
Size: 1371
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1767|klog #1767]]
Line 23: Line 24:
  * Miyo-kun did time delay fitting: [[Jupyter Notebook|https://nbviewer.jupyter.org/urls/dl.dropbox.com/s/e7tj2xvc8krdo2w/Post-Run%20MICH%20Calibration.ipynb]], [[Files in Dropbox|https://www.dropbox.com/sh/alk6mothy435dis/AABeRhaV6RRZ1CfUqnq6bc7ua?dl=0]]
  * [[klog #1767
|http://klog.icrr.u-tokyo.ac.jp/osl/?r=1767]]
  * Miyo-kun did time delay fitting: [[https://nbviewer.jupyter.org/urls/dl.dropbox.com/s/e7tj2xvc8krdo2w/Post-Run%20MICH%20Calibration.ipynb|Jupyter Notebook]], [[https://www.dropbox.com/sh/alk6mothy435dis/AABeRhaV6RRZ1CfUqnq6bc7ua?dl=0|Files in Dropbox]]

ISC Meeting on 2016/6/13

2016/5/16 14:00 - 15:00

Participants:

Agenda

  • MIF membership [Michimura]
  • bKAGRA phase 1 optical configuration study [Aso]
    • BS angle changes slightly (0.0187 deg) -> OK

    • beam spot on PR3 shifts by 5 mm -> OK

    • move PR2 and PR3 1 cm each to stabilize PRC -> OK

    • HOM structure / LSC / ASC check -> to be done [Michimura]

    • room temperature ETM availability -> ? [Hirose]

    • any others?
  • bKAGRA phase 1 commissioning plan [Michimura]
    • document posted later
  • bKAGRA optical layout around PRC [Aso]
    • POY beam is clipped by PR3 optical bench suspension wire
    • JGW-T1605261 (cartoon)

  • iKAGRA post-run calibration mystery [Aso]
  • Mirror absorption measurement status (if any) [Hirose]