ISC Meeting on 2016/6/13
2016/5/16 14:00 - 15:00
Participants:
Agenda
High priority
- MIF membership [Michimura]
members replied: Members
- bKAGRA phase 1 optical configuration study [Aso]
BS angle changes slightly (0.0187 deg) -> OK
beam spot on PR3 shifts by 5 mm -> OK
move PR2 and PR3 1 cm each to stabilize PRC -> OK
HOM structure / LSC / ASC check -> to be done [Michimura]
initiated Optickle 2 modeling: KAGRAOptickle SVN (use JGWDoc ID/PW to login)
room temperature ETM availability -> ? [Hirose]
- any others?
- bKAGRA phase 1 commissioning plan [Michimura]
- document posted later
Less priority
- bKAGRA optical layout around PRC [Aso]
- POY beam is clipped by PR3 optical bench suspension wire
JGW-T1605261 (cartoon)
- iKAGRA post-run calibration mystery [Aso]
- mysterious LPF was probably from saturation (is this end of the story?)
Miyo-kun did time delay fitting: Jupyter Notebook, Files in Dropbox
- Requirement for the noise of watchdogs for coil drivers [Aso]
- Mirror absorption measurement status (if any) [Hirose]