ISC Meeting on 2016/6/13
2016/5/16 14:00 - 15:00
Participants:
Agenda
- MIF membership [Michimura]
members replied: Members
bKAGRA phase 1 optical configuration study: JGW-G1605199 [Aso]
BS angle changes slightly (0.0187 deg) -> OK
beam spot on PR3 shifts by 5 mm -> OK
move PR2 and PR3 1 cm each to stabilize PRC -> OK
HOM structure / LSC / ASC check -> to be done [Michimura]
initiated Optickle 2 modeling: KAGRAOptickle SVN (login required)
Optickle (Optickle2) seminar on July 1 densuke
room temperature ETM availability -> ? [Hirose]
- any others?
bKAGRA phase 1 initial alignmet / commissioning plan: JGW-T1605274 [Michimura]
- 5 months (2017.5-10) for 300 K PRMI with dummy payload, 1 week (2018.1) for CRYp PRMI before cooling down
- seems like we have enough time for ISC
- everything should be ready by
- bKAGRA optical layout around PRC [Aso]
- POY beam is clipped by PR3 optical bench suspension wire
JGW-T1605261 (cartoon)
- iKAGRA post-run calibration mystery [Aso]
- mysterious LPF was probably from saturation (is this end of the story?)
Miyo-kun did time delay fitting: Jupyter Notebook, Files in Dropbox
- Requirement for the noise of watchdogs for coil drivers [Aso]
- Viewport quality for GV between SRM and OMMT [Akutsu]
- bKAGRA phase 1 analog electronics request for AEL [Michimura]
- Quad IQ Demodulator LSC: 7 for full bKAGRA (5 in stock)
- is heating problem solved? [AEL]
- Quad IQ Demodulator ASC: 22 for full bKAGRA (0 in stock)
- RF Distribution Amplifier: 10 for full bKAGRA (1 handmade in stock)
DC QPD Interface: 8 (+ AOS) for full bKAGRA (20 in stock) -> OK
- RF Patch Panel modification (too thick to fasten nuts) [who?]
- RF PD modification (Dsub 9pin won't fix tight, breaks easily with single power supply) [Doi?]
single-ended to differential, differential to single-ended: 10 each being prepared by AEL -> OK
- Quad IQ Demodulator LSC: 7 for full bKAGRA (5 in stock)
- bKAGRA ISC cabling [Michimura/Doi]
- No reply from Doi-san
- Mirror absorption measurement status [Hirose]