Line 2: Line 2:
eZuce: eZuce: http://srn.ezuce.com/joinSRN?meeting=MtM8Ma2u2DDtDe9B9DDs9t
Line 5: Line 5:
Line 12: Line 11:
    * Enomoto, Nagano (ICRR), Komori, Aritomi, Shimoda (UT), Kasuya (Titech), Kagawa, Chen, Kumagaya, Sugawara (Niigata) attended
    * [[https://granite.phys.s.u-tokyo.ac.jp/trac/LCGT/browser/trunk/mif/KAGRAOptickle/Examples|Example codes]]
Line 13: Line 14:
   * HOM structure check to decide PR2-PR3 length
    * move PR2/PR3 each by 1.18 cm to shorten PR2-PR3 length and stabilize PRMI ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5362|JGW-T1605362]])
    * ''' check if we can move 1.18 cm [Shoda->ATC]'''
   * ASC check [Enomoto] ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5362|JGW-T1605362]])
    * ASC is feasible
    * we need AS port to diagonalize ETM DIFF and BS signals
Line 21: Line 28:
   * beam profiling plan should be compatible with vacuum plan
   * how to extract AS beam should be fixed by MIF
   * '''make MS project schedule by July 15 [Michimura]'''
Line 26: Line 36:
  * remake of Quad IQ Demodulator LSC to ASC [Michimura->Niigata students?]   * remake of Quad IQ Demodulator LSC to ASC [Michimura->Niigata students?; by 2016.10]
Line 29: Line 39:
   * in the process of ordering 4-way splitter (Mini-Circuits ZFSC-4-1-S+)
  * RF Distribution Amplifier [Michimura->Niigata students?]
   * 4-way splitter (Mini-Circuits ZFSC-4-1-S+) arrived at Kamioka -> Mozumi office loft
  * RF Distribution Amplifier [Michimura->Niigata students?; by 2016.10]
Line 32: Line 42:
   * in the process of ordering RF amp (Wenzel LNBA-10-23-CK or LNBA-11-23-CK), 8-way splitter (Mini-Circuits ZCSC-8-1+), coupler (Mini-Circuits ZX30-20-4)    * '''where did front/rear panels go?'''
* in the process of ordering RF amp (Wenzel LNBA-11-23-CK-100-15)
   *
8-way splitter (Mini-Circuits ZCSC-8-1+), coupler (Mini-Circuits ZX30-20-4) arrived at Kamioka -> Mozumi office loft
Line 35: Line 47:
    * RF monitor was used in aLIGO (input from Izumi)     * RF monitor was used in aLIGO for noise hunting and IFO health check (input from Izumi)
   * '''we have to request AEL to make interface board'''
Line 45: Line 58:
 * Arm Length Stabilization plan ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5353|JGW-T1605353]])
  * we have to decide the concept before experiment at University of Toyama
  * ALS Meeting on July 27 ([[KAGRA/subgroup/ifo/MIF/Minutes20160727|Adgenda page]])
Line 65: Line 81:
 * BS baffle could make contract defect? ([[https://dcc.ligo.org/LIGO-T1000090|LIGO-T1000090]]) [Akutsu,Hiro]  * BS baffle could make contract defect? ([[https://dcc.ligo.org/LIGO-T1000090|LIGO-T1000090]])
  * ask
Akutsu and Hiro
  * BS has 370 mm dia and beam at BS is 2*36 mm dia. So
, it should be in principle OK. But recoil mass aperture should be considered.
Line 73: Line 91:
  * '''OMC suspension requirement cross check [Somiya]'''
Line 74: Line 93:
  * '''Ask Tomaru about the parameters and actuator design, range'''

ISC Meeting on 2016/7/25 14:00 - 15:00

eZuce: http://srn.ezuce.com/joinSRN?meeting=MtM8Ma2u2DDtDe9B9DDs9t

Participants:

Adgenda

  • bKAGRA Phase 1 optical configuration study [Michimura]
    • HOM structure / LSC / ASC check [Michimura]
      • initiated Optickle 2 modeling: KAGRAOptickle SVN (login required)

      • Optickle (Optickle2) seminar on July 1
        • Enomoto, Nagano (ICRR), Komori, Aritomi, Shimoda (UT), Kasuya (Titech), Kagawa, Chen, Kumagaya, Sugawara (Niigata) attended
        • Example codes

      • length sensing matrix is OK
      • HOM structure check to decide PR2-PR3 length
        • move PR2/PR3 each by 1.18 cm to shorten PR2-PR3 length and stabilize PRMI (JGW-T1605362)

        • check if we can move 1.18 cm [Shoda->ATC]

      • ASC check [Enomoto] (JGW-T1605362)

        • ASC is feasible
        • we need AS port to diagonalize ETM DIFF and BS signals
    • continue checking dummy ETM availability [Hirose]
      • cost estimate arrived
    • check if reference spheres for PR mirrors are available at Caltech [Hirose]
    • check if IMC length stability and others are compatible with 3-km PRMI [Michimura]
    • check if dummy payload is quiet enough to make PRMI [Michimura]
  • bKAGRA Phase 1 initial alignment / commissioning plan [Michimura]: JGW-T1605274

    • discussed at Extended Chief Meeting on July 4
      • beam profiling plan should be compatible with vacuum plan
      • how to extract AS beam should be fixed by MIF
      • make MS project schedule by July 15 [Michimura]

  • bKAGRA Phase 1 analog electronics (Analog Electronics for ISC) [Michimura]

    • Quad IQ Demodulator heat-up issue
      • 1st stage amp is heating up
      • we have to decide if we need 1st stage amp or not

    • remake of Quad IQ Demodulator LSC to ASC [Michimura->Niigata students?; by 2016.10]

      • MIF will take care istead of AEL
      • mass production will be taken care by AEL
      • 4-way splitter (Mini-Circuits ZFSC-4-1-S+) arrived at Kamioka -> Mozumi office loft

    • RF Distribution Amplifier [Michimura->Niigata students?; by 2016.10]

      • we will omit RF monitor for now, and add them later
      • where did front/rear panels go?

      • in the process of ordering RF amp (Wenzel LNBA-11-23-CK-100-15)
      • 8-way splitter (Mini-Circuits ZCSC-8-1+), coupler (Mini-Circuits ZX30-20-4) arrived at Kamioka -> Mozumi office loft

      • basically copy of LIGO-D1000124, but we will omit Interface for the first stage

      • ask LIGO people for necessity of RF monitor [Michimura]
        • RF monitor was used in aLIGO for noise hunting and IFO health check (input from Izumi)
      • we have to request AEL to make interface board

    • RF Patch Panel modification [Michimura->Niigata students?]

  • RF generation scheme [Michimura]
    • f1 = 3/8*f2, f3 = 10/8*f2
    • we need 2*f1, 2*f2, f3-f1, f3-f2 as well
    • use harmonics generator (x2, x3, x6, x8, x10, x16 for f2/8 = 5.62698725 MHz)
      • seeking for vendors


  • Arm Length Stabilization plan (JGW-T1605353)

    • we have to decide the concept before experiment at University of Toyama
    • ALS Meeting on July 27 (Adgenda page)

  • bKAGRA optical layout around PRC
    • POY clipping issue will be solved by modifying PR3 optical bench suspension [Shoda]
    • we need layout CAD for POY pickoff mirror, POP pickoff mirror to design baffles
      • possibility of buying baffles next FY? -> ask SEO [Aso]

      • ask SEO to hire a person dedicated for optical CAD
      • layout CAD will be prepared by each subgroup for the time being
  • iKAGRA post-run calibration mystery [Aso]
    • mysterious LPF was from saturation
    • write an elog about this conclusion [Aso]

  • Requirement for the noise of watchdogs for coil drivers [Aso]
    • recent result show dR < 1e-7 Ohm/rtHz, so it may meet the requirement

    • slow (~20 min) drift at dR ~ 5e-4 Ohm -> this should be negligible

  • Viewport quality for GV between SRM and OMMT [Akutsu]
    • aLIGO case: SRM-OFI-viewport, KAGRA case: SRM-viewport-OMMT-OFI
    • aLIGO viewport is always closed
    • if we need super quality viewport, we have to decide soon

  • BS baffle could make contract defect? (LIGO-T1000090)

    • ask Akutsu and Hiro
    • BS has 370 mm dia and beam at BS is 2*36 mm dia. So, it should be in principle OK. But recoil mass aperture should be considered.
  • bKAGRA ISC cabling [Michimura/Doi]
    • Doi-san said he will help.
  • Mirror absorption measurement status [Hirose]
  • Output optics status [Somiya]
    • suspensions for OMMT1/2 is same as IMMT1/2, ask Takahashi-san to add drivers to his list: JGW-L1605193

    • we have to make vacuum compatible PD/QPD for OMC by 2018.3
    • beam shutter: prototype done, AR coating and driver circuit design not yet
    • OMC suspension requirement cross check [Somiya]

  • Magnetic noise, actuator noise calculation for cryogenic payload [Michimura]
    • Ask Tomaru about the parameters and actuator design, range

  • Task list update (TaskList) [Michimura]

Next meeting

2016/8/8 14:00 - 15:00