ISC Meeting on 2017/1/30 14:00 - 15:00
Participants:
Next meeting
2017/2/13 14:00 - 15:00
Agenda
- Flat ETM for bKAGRA Phase 1?   
- bKAGRA Phase 1 optical configuration study [Michimura] - summary: JGW-T1605595 
- ASC [Enomoto] - noise study by NoiseBudget [Enomoto] - Enomoto volunteered to do ASC NoiseBudget; meeting on Sept 27 - trouble on number of licenses and library links, but finally able to run example model
 
 
- effect on WFS from RF HOMs [who?]
 
- check if reference spheres for PR mirrors are available at Caltech [Hirose] - 9.0m (CC), 11.5m (CC), 6.5m (CC), 5.0m (CC), 34m (CX), 36m (CX) were available
- PR2/SR2 is -3.0764m/-2.9872m and PR3/SR3 is 24.9165m. Maybe 5.0m TS can be used for PR2/SR2.
- what about PR3/SR3, PRM/SRM?
 
- check if IMC length stability and others are compatible with 3-km PRMI [Michimura]
 
- bKAGRA Phase 1 initial alignment / commissioning plan [Michimura]: JGW-T1605595 - procedure summarized in JGW-T1605692   - presented at Chief Meeting on Sept 26
- TMS BRT alignment could be tough because of faint transmitted beam after ETM installation (~0.25uW) - use green? - BS transmission for green is S:99.40% P:97.85% at 45 deg
- 100 mW green beam from PR gives ~0.12 mW at ETMY transmission
 
 
- use green? 
- check optical layout [Michimura->Aso] 
 
- check if ETM transmitted beam can go through when ETM is not installed [Michimura]   - ETM transmitted beam can reach EXT/EYT when no wedge (5.6 mm shifted from the center of EXT/EYT)
- EXT/EYT tanks/ducts are installed considering ETM wedge effect
 
- wide/narrow angle baffles for Phase 1? [Akutsu]   - talk with Uchiyama & Saito on Sept 27-28? - as for NAB: install if possible, but maybe without suspension
- as for WAB: try WAB with suspension at EXC, maybe no installaton at EYC
- first priority is cryopayloads and evacuation/cool-down
 
 
- camera to see ETM HR surface [Akutsu, Inoue, Kokeyama]   - CAL report (JGW-G1605737) 
- wide angle baffle modification is needed to see the ETM edge
 
- how to extract AS beam should be fixed by MIF - extract SR2 reflected beam at SR3 chamber (decided at the meeting on Sept 13)   
- Layout around SRs (JGW-T1605967) 
 
- IMMT1-IMMT2 beam collimation plan not yet [MIF]
- green alignment plan not yet [MIF]
- TMS possible without ITM? [Akutsu->Michimura] - check q-parameter at TMS witouht ITM
 
 
- bKAGRA Phase 1 analog electronics (Analog Electronics for ISC) [Michimura] - Quad IQ Demodulator heat-up issue - 1st stage amp is heating up
- we have to decide if we need 1st stage amp or not 
 
- Quad IQ Demodulator LSC to ASC 
 - mass production will be taken care by AEL
- 4-way splitter (Mini-Circuits ZFSC-4-1-S+) arrived at Kamioka -> Mozumi office loft 
 
- RF Distribution Amplifier JGW-D1504460 - we will omit RF monitor for now, and add them later
- front/rear panels, RF amps, 8-way splitters, couplers, cables and connectors at Mozumi office loft
 
- RF Frequency Doubler - what's the frequency? [Kamiizumi->Michimura]   - thought used for 2*f1,2*f2, but aLIGO uses them for ALS
 
 
- Requested Universal Whitening Filter with DC Power to AEL (JGW-T1605839)   - see DCQPDDriverList (see, also, DCQPDList) 
- need to coordinate with subgroups (MIF, IOO, AOS, VIS, CRY)
 
 
- Quad IQ Demodulator heat-up issue 
- RF PDs and RF QPDs - RF PD / RF QPD noise and transimpedance characterization - we need permanent test bench
 
- RF PD modification [who?] - fix DC path
- solve single supply issue (RF PDs easily break when accidentally supplied with single)
- fix plugs so that Dsub 9pin cable fixes better
 
 
- RF PD / RF QPD noise and transimpedance characterization 
- RF Cables - ordered 5m/10m SMA cables for IMC WFS (List of cables)   
 
- Output optical tables [Michimura] (OutputTables wiki) - vacuum optics to extract beams for each port (except for REFL and AS DC) and related beam shutters will also be MIF task
- EXT/EYT tables - table height fixed; they will be put on mortar surface
- isolation floor cutting and mortar application plan sent to Mirapro
- installation on Mar 2017, along with installation of EXT/EYT chambers?
 
- POS and AS tables - table height fixed; POS will be on concrete surface, AS will be on mortar surface
 
 
- Arm Length Stabilization plan (JGW-T1605353) - NoiseBudget [Kambara] - results agreed with Tatsumi Simulink model
- include fiber noise (fiber setup is different from Tatsumi model) - fiber length? how to do the wiring?   
- ask LIGO people how they are fixing the cables   - no special vibration / heat treatment [from Kawabe]
 
 
- include phase noise from mirror vibration for IR beat setup (it is one of the limiting noise source for aLIGO)
- schedule and plan for the procurement of circuits should be fixed soon - keep in touch with AEL group
 
- local oscillator phase noise (calculation method)   - discuss with Aso and redo calculation
 
 
 
- Magnetic noise, actuator noise calculation for cryogenic payload - magnetic noise JGW-T1504459 [Shimoda] 
- actuator noise and range calculation on going [Miyamoto(JGW-G1605746), Okutomi]   - TM actuator efficiency should be less than 1.5 mN/A from noise point of view
- if 1.5 mN/A, RMS velocity should be smallter than 0.04 um/sec - simulation on-going [Okutomi]
 
 
 
- Requirement on actuator range for IMMT [Ohishi]   - magnet size: 2 mm dia, 5 mm long
- coil turns: 39?
- this gives 4 times larger efficiency than the IMC coil efficiency
- IMMT resonant frequencies: pitch ~1.8 Hz, yaw ~1.5 Hz
- this gives 50/sqrt(2) mm * (1.4e-3 N/A * 4) * 4 magnets * 1/80 A/V / 9.6e-4 kg*m2 / (2*pi*1.8 Hz)2 = 8e-5 rad/V efficiency in pitch 
- is this enough? - IMC mirror (Type-C + stack) drift in yaw was less than 1 mrad/month, pitch was much less [Nakano]
- iKAGRA ETM (Type-C w/o stack) drift was ???
 
 
- RF generation scheme [Michimura] - f1 = 3/8*f2, f3 = 10/8*f2
- we need 2*f1, 2*f2, f3-f1, f3-f2 as well
- use harmonics generator (x2, x3, x6, x8, x10, x16 for f2/8 = 5.62698725 MHz (FSR for IMC)) - seeking for vendors
 
- MIF and IOO agreed to use 13.78 MHz (~= f2/8*2.45) for IMC sideband (JGW-T1605493) 
- MIF agreed to use 32 MHz and 33 MHz for ALS sidebands JGW-T1605626 
- may be IMC sideband (and ALS sidebands) should also needs to be phase locked with f1/f2/f3 to avoid "whistling noise"
- in case of KAGRA, we don't need Frequency Doubler or Frequency Divide By Two for ALS   - is this true?
 
 
- bKAGRA optical layout around PRC - POY clipping issue will be solved by modifying PR3 optical bench suspension [Shoda]
- we need layout CAD for POY pickoff mirror, POP pickoff mirror to design baffles - budget for baffles around POY and POP were shifted to next FY [SEO]
 
 
- viewport quality for GV between SRM and OMMT [Akutsu] - aLIGO case: SRM-OFI-viewport, KAGRA case: SRM-viewport-OMMT-OFI
- aLIGO viewport is always closed
- if we need super quality viewport, we have to decide soon 
 
- BS baffle could make contract defect? (LIGO-T1000090) - ask Akutsu and Hiro
- BS has 370 mm dia and beam at BS is 2*36 mm dia. So, it should be in principle OK. But recoil mass aperture should be considered.
 
- bKAGRA ISC cabling [Michimura/Doi] - announced to IOO mailing list
- need to update the cabling diagram
 
- Mirror absorption measurement status [Hirose]
- Output optics status [Somiya] - suspensions for OMMT1/2 is same as IMMT1/2 (driver list for now: JGW-L1605334) 
- we have to make vacuum compatible PD/QPD for OMC by 2018.3
- beam shutter: prototype done, AR coating and driver circuit design not yet
- OMC suspension is TMS-like plate spring and single pendulum [Somiya]
 
- Task list update (TaskList) [Michimura] 