Line 37: Line 37:
  * Fixed mirrors for AS port (including SR2)

 * IR/green steering mirrors [Michimura]
  * proposed specs
   * HR reflectivity: more than 99% for both 1064nm and 532nm
   * AR refectivity: less than 0.3 % for 1064nm, similar for 532nm
   * incient angle: 20-45 deg, s-polarization
   * radius of curvature: flat
   * size: 2-inch
   * wedge: 1 deg
   * substrate: Fused Silica
   * surface quality: λ/20, 0.1 nm rms roughness

ISC Meeting on 2017/6/19 14:00 - 15:00

Participants: (eZuce meeting)

Next meeting

2017/7/3 14:00 - 15:00

back to Meetings page

Agenda

  • PSL EOM Layout re-consideration [Enomoto] (JGW-T1706748)

    • Delay-line length decided to be 2.66 m (instead of 8.88 m)
    • Modulation phase between f1 AM and PM is always aligned (we need this to be aligned)
    • Modulation index needed at each EOM is less than measured maximum index by Uehera (JGW-T1605611)

    • Optickle simulation by Kohei Yamamoto
      • simulation on imperfections (MZ arm asymmetry, MZ lock, EOM phase difference control etc.)
      • start with hand calculation, simple setups, and then to full IFO simulation
      • meeting with him on June 6.
    • Requirement on carrier power loss?
  • OFI and OMC status? [Somiya]
    • look for OFI with larger aperture [Somiya]
    • output optics task sharing status?
    • OMC baseplate issue?
    • design review on June 26
  • Actuator noise modeling [Michimura,Miyamoto] (JGW-T1503453)

    • Updated magnet size for cryopayload marionette (ActuatorDesign wiki)

    • Needs to implement frequency noise, but FSS modeling with ALS is complicated [student!]
    • Needs to update lock acquisition section (see ISC Meeting minutes 20170410) [Michimura]

  • bKAGRA Phase 1 initial alignment / commissioning plan [Michimura]: JGW-T1605692

    • updated based on current schedule
      • ETMX and ETMY cryopayload installation almost at the same time
      • MICH lock at room temperature before cooling down (instead of cooling down ETMY first)
      • AS cannot be used for room temperature MICH lock (SR3 not ready)
      • SR2 won't be ready by the end of March 2018
    • Fixed mirrors for AS port (including SR2)
  • IR/green steering mirrors [Michimura]
    • proposed specs
      • HR reflectivity: more than 99% for both 1064nm and 532nm
      • AR refectivity: less than 0.3 % for 1064nm, similar for 532nm
      • incient angle: 20-45 deg, s-polarization
      • radius of curvature: flat
      • size: 2-inch
      • wedge: 1 deg
      • substrate: Fused Silica
      • surface quality: λ/20, 0.1 nm rms roughness

See this page for other agendas.