Line 36: Line 36:
   * Ochi is measuring vibration of cryo-shield, which is different cryo system from the mirror
   * Yamada is measuring spring constant of heat links
   * Miyamoto has the cryopayload suspension model

ISC Meeting on 2017/7/3 14:00 - 15:00

Participants: (eZuce meeting)

Next meeting

2017/7/31 14:00 - 15:00 (July 17 is a holiday)

back to Meetings page

Agenda

  • PSL EOM Layout re-consideration [Enomoto] (JGW-T1706748)

    • Delay-line length decided to be 2.66 m (instead of 8.88 m)
    • Modulation phase between f1 AM and PM is always aligned (we need this to be aligned)
    • Modulation index needed at each EOM is less than measured maximum index by Uehera (JGW-T1605611)

    • Optickle simulation by Kohei Yamamoto
      • simulation on imperfections (MZ arm asymmetry, MZ lock, EOM phase difference control etc.)
      • start with hand calculation, simple setups, and then to full IFO simulation
    • Requirement on carrier power loss?
    • Comment from Stefan Ballmer
      • Similar calculation was done in LIGO in the past. Displacement noise requirement for MZ was tough (~1e-14 m/rtHz).
      • Any in-air interferometer suffer from jitter and frequency noise which cannot be suppressed.
  • OFI and OMC status? [Somiya]
    • look for OFI with larger aperture [Somiya]
    • output optics task sharing status?
    • OMC baseplate issue?
    • design review on June 26 at Titech (JGW-G1706853,JGW-G1706854), layout review on July 3 {*}

      • OMC suspension (Flipped optics or not? 3 or 4 wires? 2 or 1 DC PD? How to damp and actuate pendulum?), OFI suspension
  • Actuator noise modeling [Michimura,Miyamoto] (JGW-T1503453)

    • Updated magnet size for cryopayload marionette (ActuatorDesign wiki)

    • Updated lock acquisition section to derive velocity requirements for suspensions (see ISC Meeting minutes 20170410) [Michimura]

    • Magnetic noise calculation updated (JGW-T1504459) [Shimoda] {*}

      • Added torque effect on magnets
    • Needs to implement frequency noise, but FSS modeling with ALS is complicated [student!]
    • Discuss mirror vibration from heat link {*}

      • Ochi is measuring vibration of cryo-shield, which is different cryo system from the mirror
      • Yamada is measuring spring constant of heat links
      • Miyamoto has the cryopayload suspension model
  • bKAGRA Phase 1 initial alignment / commissioning plan [Michimura]: JGW-T1605692

    • Fixed mirrors for AS port (including SR2)
    • Some comments from the Chief Meeting
      • Revised schedule seems compatible with PRMI. Why not?
        • PRMI is an option after achieving the Phase 1 goal, if it doesn't delay the final bKAGRA JGW-T1605595

      • Initial alignment does not interfere with ITM Type-A installation work?
      • Evacuation of IXC/IYC compatible with Type-A installation work?
      • Baffle PDs for initial alignment in vacuum
        • confirmed with Akutsu that he is thinking of putting PDs on narrow angle baffles
        • vibration isolation for baffle PDs necessary?
        • possibility of seeing beams with Tcam
  • IR/green steering mirrors [Michimura] (see [kagra-isc 01649])
    • for POP/POS and green steering in PR2/SR2 chamber, needs picomotors and ~40 cm pedestals
    • need this by the end of August 2017 (after PR2 installation on June, before IR initial alignment starts on September)
    • proposed mirror specs
      • HR reflectivity: more than 99% for both 1064nm and 532nm
      • AR refectivity: less than 0.3 % for 1064nm, similar for 532nm
      • incient angle: 20-45 deg, s-polarization
      • radius of curvature: flat
        • should be something like: larger than *** km {*}

      • size: 2-inch
      • wedge: 1 deg
      • substrate: Fused Silica
      • surface quality: λ/20, 0.1 nm rms roughness
  • DC QPD holder [Michimura] {*}

    • we are using oplev QPD (JGW-D1402411) for ISC DC QPD

    • we will need QPD mounts for them, just like oplev QPD mount (JGW-D1503562)

    • beam height should be 4inch to use similar mount, with small modification of spacer (instead of 3inch in JGW-D1402607)

      • RF PD, RF QPD boxes are designed for 4inch beam height

See this page for other agendas.