  * Measure if there are any structure to DARM sensitivity coming from compound SRM.

ISC Meeting on 2020/03/09 14:00 - 15:00

Participants: Matteo Leonardi, Tomotada Akutsu, Masayuki Nakano, Koji Arai, Ryutaro Takahashi, Osamu Miyakawa, Shinji Miyoki, Koji Nagano, Hiro Yamamoto, Kiwamu Izumi, Yuta Michimura

Zoom meeting: https://zoom.us/j/6676627462

Next meeting

TBD

back to Meetings page

Minutes

  • DRFPMI trial was done when the alignment is not so good. With current alignment, DRFPMI might be possible [Masayuki]
  • We also need to consider if compound SRM is good or not. If not, we have to think about making a monolithic 0% SRM or 70% SRM (takes 0.5 years?). [Matteo]
    • Compound SRM was used for aLIGO O1 and O2, but KAGRA might have more issue with compound SRM since KAGRA have more HOMs at AS [Koji A.]
  • If ITM re-polishing is necessary to compensate TWE map, it takes 1 year with the most optimistic case to do them. [Matteo]
  • The effect of contrast defect and frequency/intensity noise coupling should be measured more directly. [Koji A.]
  • A/I for Michimura