Differences between revisions 5 and 12 (spanning 7 versions)
Revision 5 as of 2020-07-06 07:12:00
Size: 3640
Comment:
Revision 12 as of 2020-07-06 14:19:22
Size: 4088
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
Participants: Participants: Shinji Miyoki, Haoyu Wang, Eleonora Caposaca, Kiwamu Izumi, Koji Nagano, Masayuki Nakano, Matteo Leonardi, Osamu Miyakawa, Ryutaro Takahashi, Kentaro Somiya, Tomotada Akutsu, Yoichi Aso, Yuta Michimura
Line 6: Line 6:
Time: https://www.timeanddate.com/worldclock/meetingdetails.html?year=2020&month=7&day=6&hour=4&min=30&sec=0&p1=248&p2=237&p3=4399&p4=137 Your time zone: https://www.timeanddate.com/worldclock/fixedtime.html?iso=20200706T0430
Line 26: Line 26:
   * PRX length: about 68 m https://klog.icrr.u-tokyo.ac.jp/osl/?r=14633    * PRX length: about 68 m (designed: 68.2559 m) https://klog.icrr.u-tokyo.ac.jp/osl/?r=14633
Line 29: Line 29:
   * With X-arm locked https://klog.icrr.u-tokyo.ac.jp/osl/?r=14620
   * carrier and f1 3rd mode is overlapped?
   * Summary http://klog.icrr.u-tokyo.ac.jp/osl/?r=14696
   * carrier and f1 3rd mode is overlapped? http://klog.icrr.u-tokyo.ac.jp/osl/?r=14620
Line 38: Line 38:
   * https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11792
 * New ISC meeting slot?
  * Bi-weekly SEO and Chief meeting on Modays, from 15:00 JST
  * How about bi-weekly Mondays 13:00 JST (before chief meetings)

ISC Meeting on 2020/07/06 13:30 - 14:30

Participants: Shinji Miyoki, Haoyu Wang, Eleonora Caposaca, Kiwamu Izumi, Koji Nagano, Masayuki Nakano, Matteo Leonardi, Osamu Miyakawa, Ryutaro Takahashi, Kentaro Somiya, Tomotada Akutsu, Yoichi Aso, Yuta Michimura

Zoom meeting: https://zoom.us/j/5045179604

Your time zone: https://www.timeanddate.com/worldclock/fixedtime.html?iso=20200706T0430

Next meeting

When necessary

back to Meetings page

Minutes

Agenda

Copy from previous meeting

  • Simulation activities necessary
    • LSC and ASC simulations with current ITMs and current interferometer setup
      • Especially LSC simulations not done for PRFPMI and DRMI, and 3f locking
      • Compare measured LSC and ASC sensing matrices with simulations
      • Compare measured recycling gain (for carrier and sidebands) with simulations
      • Compare measured AS mode content with simulations
      • Compare measured MICH/PRCL/SRCL controls noise coupling with simulations
      • Compare measured intensity/frequency noise coupling with simulations
    • Thermal lensing in BS
  • Measurements necessary to do simulation work
    • PRC (SRC) length and Gouy phase
    • Schnupp asymmetry
    • modulation depth (arm cavity scan)
    • arm cavity length (arm cavity scan)
    • arm cavity round-trip loss measurement with birefringence effect correctly taken into account (with PBS at POP/POS and TRX/TRY) JGW-T2011633

    • Power recycling gain for carrier and sidebands
    • Throughput from IMC output to AS RF, OMC DC, REFL, POP, TRX, TRY
  • Measurements necessary to compare the result with simulation

KAGRA/subgroup/ifo/MIF/Minutes20200706 (last edited 2020-07-06 16:26:33 by YutaMichimura)