= ISC Meeting on 2021/06/28 14:00 - 15:00 = Participants: Keiko Kokeyama, Chiaki Hirose, Kiwamu Izumi, Masayuki Nakano, Ryosuke Sugimoto, Satoshi Tanioka, Yoichi Aso, Tomotada Akutsu, Kenta Tanaka, Shoichi Oshino, Hiroaki Yamamoto, Shinji Miyoki, Osamu Miyakawa, Yuta Michimura Zoom meeting: https://zoom.us/j/6676627462 Your time zone: https://www.timeanddate.com/worldclock/fixedtime.html?iso=20210628T0500 === Next meeting === TBD [[LCGT/subgroup/ifo/ISC/Meetings|back to Meetings page]] == Minutes == * Phase camera project [Kokeyama] * How to get the reference beam? * IR fiber is already there at POP/POS (main + spare for green, two for IR; 4 fibers in total for each table) * Speed of phase camera? * Important if we use the signal for some alignment control etc. * At Virgo, it was ~ 1 shot / 1 sec. Daniel Brown et al at Adelaide are making faster ones. * Discuss more after result comes out (October-ish) * Optical table layout and electronics needs to be checked * Maybe we need such device anyway at some point * '''DECISION''' KAGRA ISC supports the proposal * ALS report [Izumi] * Arm locking section of the users manual is not finished. * '''A/I''': Talk with Nakano etc. to complete the manual [Izumi] * Noise level of PLL control/error signals are somehow breathing * '''A/I''': Remind Tanioka about the procurement of items related to alignment [Michimura] * IMC ASC report [Kenta, C. Hirose] * Control strategy needs to be re-checked. * Analytical calculation and FINESSE simulation result do not match completely. * '''A/I''': Check the calbiration of A2L coupling factor and the status of coil balancing. * IMMT1T ISS POM [Michimura] * There is another uncertainty on the loss introduced at the viewports (AR specified only at 0 deg incidence). * '''DECISION''' We will go for 90:10. == Agenda == * IMC ASC [Kenta, C. Hirose, 20 min] https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13047 [[attachment:ISCmeeting_0628_hirose.pdf]] * Phase camera project [Kokeyama, 10 min] [[attachment:isc0628_kk.pdf|slide]] * ALS report [Izumi, 10 min] * ALS users manual https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13031 * Remaining tasks for ALS https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13042 * IMMT1T ISS POM spec (see below) [Michimura, 10 min] * [[KAGRA/Subgroups/MIF/O4CommissioningTaskList|O4 commissioning task list]] [Izumi, Michimura] * Any missing items? * Other reports * Non-polarizing beam splitters for in-air optical tables ordered https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12956 [Michimura] * In-vac steering mirrors: https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12592 [Michimura] * IMMT1T ISS POM: Spec to be finalized * R:T=90:10 for 1064 nm, transmissive for oplev beam (663-675nm) https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12949 * 0.2963% @ 1064 nm measured by the vendor. 0.22% measured by Akutsu-san at the site. * Need to check again if ISS people is happy about R=90% * Wedge finalized to be 1 deg (wedge side is HR) * All reflective steering mirrors: Spec to be finalized * Order AoI=0-30 deg ones and AoI=30-50 ones * Wedge finalized to be 0.5 deg * Optical table cover [Michimura] * IMC TRANS assembled, IMC REFL delivered * Parts for fixing FFU on REFL, POP, AS ordered * TRX and TRY ordered * Additional small FFU for POS ordered