⇤ ← Revision 1 as of 2021-07-13 11:05:57
Size: 649
Comment:
|
Size: 644
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 16: | Line 16: |
1. How to perform the daily alignment of IFO, 1. Simulation of WFS, 1. How to close ASC loops during the lock acquisition process, 1. How to use local sensors, WFS signals and BPC, etc. to enhance stability and to minimize noise contribution. |
1. How to perform the daily alignment of IFO 1. Simulation of WFS 1. How to close ASC loops during the lock acquisition process 1. How to use local sensors, WFS signals and BPC, etc. to enhance stability and to minimize noise contribution |
ISC Meeting for External Review Preparations on 2021/07/13 15:00 - 16:00
Participants:
Zoom meeting: https://zoom.us/j/6676627462
Your time zone: https://www.timeanddate.com/worldclock/fixedtime.html?iso=20210713T0600
Minutes
Agenda
- External Review candidate dates
- External Review topics
- How to perform the daily alignment of IFO
- Simulation of WFS
- How to close ASC loops during the lock acquisition process
- How to use local sensors, WFS signals and BPC, etc. to enhance stability and to minimize noise contribution