= ISC Meeting for ASC Strategies 2021/08/16 13:00 - 15:00 = Participants: Shinji Miyoki, Naoki Koyama, Osamu Miyakawa, Terrence Tak Lun Tsang, Yoichi Aso, Tatsuki Washimi, Chiaki Hirose, Takafumi Ushiba, Kenta Tanaka, Marc Eisenmann, Hirotaka Yuzurihara, Yuta Michimura Zoom meeting: https://zoom.us/j/5045179604 Your time zone: https://www.timeanddate.com/worldclock/fixedtime.html?iso=20210816T0400 === Next meeting === TBD [[LCGT/subgroup/ifo/ISC/Meetings|back to Meetings page]] == Minutes == * Possibility of shortening Xarm and Yarm commissioning * We decided to show the shortened version of the schedule and task list, and ask for suggestions. * Shortened task list * POP investigation, REFL WFS and POP WFS consistency check, arm cavity alignment to check mid-size baffle positions * Other tasks are postponed to FPMI commissioning in-vac * Things to ask for suggestions * Target values for mode matching and laser power throughput * Whether if we should adjust PR2 and PR3 to improve the mode matching in air * Requirements for local damping * We need to check the status of coil drivers actually installed. For most of the suspensions, high power ones are currently used and this eases the requirement. * Nakano-kun said PRs are important for achieving the lock, but 7.3 um/sec requirement seems to be easily achievable. We need to check the current values. * For Type-A suspensions, <240 um/sec is the requirement for arm green locking, but there is another requirement coming from the central part locking. ITMs needs to be settled down to a level comparable to BS, SRs and PRs to lock recycling cavities (See text right below Table 5.1 in Sekiguchi thesis). * Let's set the requirement to be <0.44 um/sec for central part locking * What we want to ask the reviewers? * Send Michimura an email if you have some suggestions. == Agenda == * External review next week! August 24, 2021 22:00-0:00 (JST) * Requirements for local damping summarized * ITMs and ETMs (Type-A): <240 um/sec, <0.1 urad RMS * BS (Type-B): <1.6 um/sec, <1 urad RMS * SRs (Type-B): <0.44 um/sec, <1 urad RMS * PRs (Type-Bp): <7.3 um/sec, <1 urad RMS * References: * K. Okutomi PhD thesis (Table 3.5) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=9347|JGW-P1809347]] * T. Sekiguchi PhD thesis (Table 5.2) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4155|JGW-P1504155]] * Y. Michimura et al (Section 6) [[https://doi.org/10.1088/1361-6382/aa90e3|Classical and Quantum Gravity 34, 225001 (2017)]] * Possibility of shortening Xarm and Yarm commissioning? * http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/MIF/ExternalReview2021#agenda2 * Latest schedule: https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9209 * Strategy for the arm cavity commissioning while the central area is open * Should we adjust the position of the PR2 and PR3 to improve the mode matching to the arms at Xarm/Yarm commissioning periods? Or after the center area is evacuated? * What we want to ask the reviewers? * IMC ASC report? (Kenta, Chiaki) * To be discussed at the IMC ASC weekly on Wednesday