In-vac PD/QPD layout meeting 2024/11/20

Time: Nov 20, 2024 10:00-10:30

Participants: Ray-Kuang Lee, Huali Chen, Yoichi Aso, Yuta Michimura

Zoom meeting

Minutes

  • Huali showed the layout idea for AS RF.
    • Enclosure size for RF QPDs were different. Needs to be updated. RF QPD enclosure size is in LIGO-D1102002.

    • Need to include OMC REFL RF QPDs as well.
    • In our case, we don't need to care about the Gouy phase separation between steering mirrors
  • Beam height
    • RF QPD height is 4 inch, but the beam height in the OMC chamber is 210 mm.
    • Put a periscope to lower the beam height?
  • Put optics on a breadboard to make maintenance/test easier (make it easier to remove and re-install OSTM)
    • Do we also need to have QPDs on the breadboard or not?
    • If QPDs are on the breadboard, we also have to remove the cables for QPDs when moving the breadboard.
  • Steering mirrors for RF QPDs: One PZT and one picomotor for QPD centering needed
  • A/I

    • Update the layout to include OMC REFL RF QPDs [Huali]
    • Send Huali the part numbers for in-vac steering mirror mounts [Yuta]
    • Update JGW-T2416178. OMC REFL QPD should be RF, not DC. [Yuta]

      • DONE on Jan 7, 2025
  • Next meeting: in the week of Jan 20, 2025
    • Decided to Jan 23, 2025 14:00-15:00 (JST)