= In-vac PD/QPD layout meeting 2025/02/28 = Time: Feb 28, 2025 14:00-14:40 Participants: Ray-Kuang Lee, Huali Chen, Yoichi Aso, Yuta Michimura Zoom meeting == Minutes == * Huali showed almost the final layout idea for AS RF and OMC REFL, with squeezing injection optics. * OSTM transmission seems different from CAD * Probably because OSTM wedge is not included in Huali's calculations * Add periscopes for AS RF in-vac path and OMC REFL path, and a beam diverter for AS RF in-vac path * Adding periscopes can reduce the height from approx. 210 mm to 4 inch, and we can use smaller and lighter pedestals * Check if OMC shroud is not conflicting * Next step is to collect comments for AS and to start REFL/POP planning * New student might be available * REFL/POP should be done by around summer * '''A/I''' * Update the layout to include periscopes and a beam diverter, add a wedge to OSTM and upload the layout to JGWdoc [Huali] * OSTM is 100 mm dia, 30 mm thick, with wedge of 2 deg * Thicker side is OMC side from the drawing, but actually installed flipped, so thinner side is OMC side (see Fig. 2 of [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=30159|klog #30159]]) * Find OMC shroud drawing [Michimura] * https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=15840 * https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=15865 * https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16104 * Updated layout will be shared with relevant people for comments [Michimura] * Collect information for REFL and start the REFL layout planning (... and POP next) [Michimura] * Next meeting: TBD on the week of March 24, with a new student