Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2025-04-22 13:23:45
Size: 935
Comment:
Revision 4 as of 2025-04-22 15:11:35
Size: 1425
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
Time: Apr 22, 2025 14:00- Time: Apr 22, 2025 14:00-14:30
Line 4: Line 4:
Participants: Ray-Kuang Lee, Huali Chen, Ryan Yang, Yoichi Aso, Yuta Michimura Participants: Huali Chen, Ryan Yang, Yoichi Aso, Yuta Michimura
Line 11: Line 11:
  * We will need to add a fast beam shutter between OFI and OSTM
  * We will need to design a beam diverter and RF QPDs based on LIGO design
  * We will need to make this a 3D CAD model
   * Need to design pedestals, periscopes, optical bench etc.
  * We will need to add a fast beam shutter between OFI and OSTM at some point
Line 17: Line 14:
  * In-vac layout complete. Fits in 800 mm dia.
  * Set tilt of all RF PDs and RF QPDs to 15 deg, following LIGO layout.

 * To make CAD drawings based on these layout...
  * We will need to design a beam diverter and RF QPDs based on LIGO design
  * We will need to design pedestals, periscopes, optical bench etc.
   * For 210 mm heigh optics, follow [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3916|JGW-D1503916]].
   * For 4 inch heigh optics, [[https://www.thorlabs.com/thorproduct.cfm?partnumber=BA1/M|Thorlabs BA1/M]] for the base and [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8429|20mm dia. posts]].
Line 19: Line 25:
  * Reduce the size of the breadboard to 800 mm dia, and add RF PD layout for REFL [Ryan]
  * Slightly update the layout to have more space between AS RF beam and OMC REFL RF QPD [Huali]
  * Check IFI chamber layout if POM2 the beam is hitting the center of POM2 [Michimura]
  * Avoid 0.5 inch optics and make them 1 inch, and upload current layout to JGWdoc [Ryan]
   * DONE [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16644|JGW-G2516644]]
  * Design in-air REFL layout by following current design [Ryan]

In-vac PD/QPD layout meeting 2025/04/22

Time: Apr 22, 2025 14:00-14:30

Participants: Huali Chen, Ryan Yang, Yoichi Aso, Yuta Michimura

Zoom meeting

Minutes

  • AS (Huali)
    • Updated layout in JGW-G2516616

    • We will need to add a fast beam shutter between OFI and OSTM at some point
  • REFL (Ryan)
    • In-vac layout complete. Fits in 800 mm dia.
    • Set tilt of all RF PDs and RF QPDs to 15 deg, following LIGO layout.
  • To make CAD drawings based on these layout...
    • We will need to design a beam diverter and RF QPDs based on LIGO design
    • We will need to design pedestals, periscopes, optical bench etc.
  • A/I

    • Avoid 0.5 inch optics and make them 1 inch, and upload current layout to JGWdoc [Ryan]
    • Design in-air REFL layout by following current design [Ryan]
  • Next meeting: TBD on the week of June 26 ?