In-vac PD/QPD layout meeting 2025/05/30

Time: May 30, 2025 14:00-14:40

Participants: Huali Chen, Ryan Yang, Yoichi Aso, Yuta Michimura

Zoom meeting

Minutes

  • REFL (Ryan)
    • In-air layout basically complete.
    • Need to update the following:
      • Remove in-vac periscope and add in-air periscope
      • Make in-air path parallel to the grid of M6 screw holes of the optical table
    • Current periscope changes the height by 92.4 mm to make the in-air beam height to be 4 inch
    • Need to start designing the vacuum tank
  • AS (Ryan)
    • Included new optical layout in the CAD drawing.
    • 0.5 inch optics and 2 inch lens need to be modified to 1 inch. Use 1 inch for all.
    • Basically OK, but ORM6 interferes with a foot of OMC shroud. Need to be discussed with relevant people.
      • Slightly modify OMC REFL pick-off mirror angle, or modify OMC shroud or modify ORM6 pedestal
    • Periscope for in-vac layout in OMC tank needs to be designed.
      • Height change 210 mm -> 1 inch

    • Periscopes, beam diverters, RF QPDs, optical bench need to be designed.
  • POP (Yuta)
    • Need to collect information for start designing things.
  • A/I

  • Next meeting: TBD on the week of June 23 ?