Size: 2538
Comment:
|
← Revision 5 as of 2025-06-23 14:30:50 ⇥
Size: 2728
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 46: | Line 46: |
* ISC TransMon Periscope Lens Bracket https://dcc.ligo.org/LIGO-D1003296/public | |
Line 47: | Line 48: |
* See last two pages: https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16178 |
In-vac PD/QPD layout meeting 2025/05/30
Time: May 30, 2025 14:00-14:40
Participants: Huali Chen, Ryan Yang, Yoichi Aso, Yuta Michimura
Zoom meeting
Minutes
- REFL (Ryan)
- In-air layout basically complete.
- Need to update the following:
- Remove in-vac periscope and add in-air periscope
- Make in-air path parallel to the grid of M6 screw holes of the optical table
- Current periscope changes the height by 92.4 mm to make the in-air beam height to be 4 inch
- Need to start designing the vacuum tank
- AS (Ryan)
- Included new optical layout in the CAD drawing.
- 0.5 inch optics and 2 inch lens need to be modified to 1 inch. Use 1 inch for all.
- Basically OK, but ORM6 interferes with a foot of OMC shroud. Need to be discussed with relevant people.
- Slightly modify OMC REFL pick-off mirror angle, or modify OMC shroud or modify ORM6 pedestal
- Periscope for in-vac layout in OMC tank needs to be designed.
Height change 210 mm -> 1 inch
- Periscopes, beam diverters, RF QPDs, optical bench need to be designed.
- POP (Yuta)
- Need to collect information for start designing things.
A/I
- Update REFL and OMC layout based on the comments today and upload the current version to JGWdoc [Ryan]
- DONE
20250530_RFQPD and RFPD Optical Layout of REFL Port_2D https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16702
20250530_OMC chamber 3D drawing https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16705
- Found new issue that height of ORM1 is not consistent
- Consult with relevant people on how to deal with ORM6 and OMC shroud situation [Yuta]
Beam layout in the CAD drawing Sato-san provided is based on the design, but the position of the optics are based on the actual locations as installed. https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16678
- So, ORM6 situation should be fine.
- As for the height of ORM1, this is due to the base of OFI. Just need to adjust the height of the pedestal.
- Also ,ORM1 also need to be 1-inch optic (currently, it is 0.5-inch in the drawing).
- Consult with VAC people to start designing REFL PD tank [Yuta]
- Collect some information to start in-vac periscope design [Yuta]
ALIGO IO L1 IN VACUUM INPUT PERISCOPE ASSEMBLY https://dcc.ligo.org/LIGO-D1002350
ISC TransMon Periscope Lens Bracket https://dcc.ligo.org/LIGO-D1003296/public
- Collect some information to start POP design [Yuta]
See last two pages: https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16178
- Update REFL and OMC layout based on the comments today and upload the current version to JGWdoc [Ryan]
- Next meeting: TBD on the week of June 23 ?