= In-vac PD/QPD layout meeting 2025/07/29 = Time: July 29, 2025 14:00-15:00 Participants: Huali Chen, Ryan Yang, Ray-Kuang Lee, Yoichi Aso, Yuta Michimura Zoom meeting == Minutes == * In-vac periscope (Ryan) * First design based on modification of https://dcc.ligo.org/LIGO-D1201410 presented. * Modified the direction of the beam * Modified to use Opto-Sigma VMHG-50.8 instead of Siskiyou LIGO mirror mounts. * Modified to have slotted holes to make it height adjustable * Default height is 4 inch - 15 mm (baseplate thickness) for lower mirror, 210 mm for upper mirror * Baffle hole size need to be checked to see if it is not too small or not too large compared with the beam size * Resonant frequency need to be checked with FEM * If too low, re-design needed (e.g. make the slotted holes short). * POP design (Ryan) * Used the distance of 1399 mm for in-vac POP steering mirror and HBS1 on POP table [Check] * Found that the beam size on HBS1 (2 inch mirror) is quite large (~10 mm radius) * POP forward beam need to be added to the layout * In-air POP beam and green beam layout need to be updated to see if they fit in POP table * Beam is quite elliptic although currently assuming a circular beam from PR2 * Try to use qx and qy in [[https://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/ModeMatch|ModeMatch wiki page]] for designing the telescope * OMC chamber update (Yuta) * Periscopes and fast beam shutter (https://dcc.ligo.org/D2200426) need to be added to the CAD layout to see if they fit. * If the fast beam shutter does not fit, OFI need to be moved towards Y-arm, and the position of ORM1 need to be re-adjusted. Note that the OFI bases are not moved. * Base plate for RF QPD paths need to be designed. * May be split into two so that it won't be too big for installing through the door of the OMC chamber. * Start with 15 mm thick, and try FEM to see if this thickness is enough. * '''A/I''' * Consult with VAC people to start designing REFL PD tank [Yuta] * Check the resonant frequency of the in-vac periscope with FEM [Ryan] * Double check the beam size on HBS1 [Yuta] * Try to use qx and qy in [[https://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/ModeMatch|ModeMatch wiki page]] for designing the telescope for POP [Ryan] * Add POP forward beam to the POP layout [Ryan] * Add in-air POP layout and green layout [Ryan] * Check if the in-vac periscope fits in OMC chamber layout [Ryan] * Check if the fast beam shutter fits in OMC chamber layout, and move OFI towards Y-arm if needed [Ryan] * Start designing the base plate for the RF QPD paths in the OMC chamber [Ryan] * Add beam diverter (https://dcc.ligo.org/LIGO-D1100642), base plate, and beam dumps to the OMC chamber layout [next step...] * https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16705 * Create cable list (RF QPDs, picomotors, PZTs, beam shutter, beam diverter) for OMC chamber to see their weight for designing OMC vibration isolation table [Yuta; by the end of this year] * Next meeting: TBD