In-vac PD/QPD layout meeting 2025/10/22
Time: October 22, 2025 14:00-14:30
Participants: Huali Chen, Ryan Yang, Ray-Kuang Lee, Yuta Michimura
Zoom meeting
Minutes
- POP design (Ryan)
- POP in-vac, POP in-air, POP forward in-air path populated. Not yet for green and POP in-air polarization monitor optics.
- POP in-vac RF QPD path has quite large astigmatism (sagittal has 45 deg Gouy phase separation but tangential has ~30 deg).
- For green optics, basically copying the current layout is fine.
- In-vac periscope (Ryan)
New design following LIGO-D1002350 is ongoing.
- The top mirror height will be 200 mm, and the lower mirror height will be 4 inch - 15 mm for the periscope.
- RF QPD plates with 15 mm thick will be put on the OMC vibration isolation table.
- Beam dump will be put behind the mirror, and not the baffle in front of the mirror.
- Because of the size of the periscope, RF QPD path layout and RF QPD baseplate need to be re-adjusted slightly.
- In-vac periscope fabrication
- Two periscopes for OMC chamber needed. Not for REFL and POP.
- As a first step, Ray-Kuang will see if company in Taiwan can fabricate.
A/I
- Consult with VAC people to start designing REFL/POP PD tank [Yuta]
- Design a new periscope with 2 inch mirrors fixed on plates (not mirror mounts) on a rectangular structure. [Ryan]
- Check the resonant frequencies with FEM [Ryan]
- Re-adjust the OMC chamber layout based on the new periscope design [Ryan]
- Send Ryan with the details of GFI and DC PD for POP [Yuta]
Create cable list (RF QPDs, picomotors, PZTs, beam shutter, beam diverter) for OMC chamber to see their weight for designing OMC vibration isolation table [Yuta; by the end of September?] -> Done on September 25 with Akutsu-san and Sato-san.
- Next meeting: TBD