= In-vac PD/QPD layout meeting 2025/11/26 = Time: 14:00-14:30 Participants: Huali Chen, Ryan Yang, Ray-Kuang Lee, Yoichi Aso, Yuta Michimura Zoom meeting == Minutes == * POP design (Ryan) * POP in-vac/in-air design completed * POP Forward in-air design needs to be updated to use DC QPD instead of RF QPD. * Lenses for POP forward beam can be found here: https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0096/T1909623/009/20220407_KAGRA_POP.svg * Green X design needs to be updated to avoid conflict between the chamber * Lens information needed * In-vac periscope (Ryan) * New design following [[https://dcc.ligo.org/LIGO-D1002350|LIGO-D1002350]] is ongoing. * The top mirror height is 200 mm, and the lower mirror height will be 4 inch - 15 mm. * Mirror holder * '''A/I''' * Consult with VAC people to start designing REFL/POP PD tank [Yuta] * Send Ryan information on lenses for the POP table [Yuta] * Design a new periscope with 2 inch mirrors fixed on plates (not mirror mounts) on a rectangular structure. [Ryan] * Upload the current version for comments [Ryan] * Check the resonant frequencies with FEM [Ryan] * Re-adjust the OMC chamber layout based on the new periscope design [Ryan] * Get a quote [Ryan] * Design a base plate for OMC chamber * What to do with a beam diverter? * Next meeting: TBD