Differences between revisions 3 and 4
Revision 3 as of 2018-06-08 17:40:14
Size: 543
Comment:
Revision 4 as of 2018-06-08 17:42:02
Size: 676
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * Found we needed more sophistication on the damper design.
Line 11: Line 12:
 * Found we needed some ballast masses to balance and locate the NAB.

20180601

Today's activities in Mitaka

Workers: Ikenoue, Simon

  • Measured the resonant frequencies of the NAB suspension in 5 DoFs; see here. The report itself was posted on June 7.

  • Found we needed more sophistication on the damper design.

Workers: Ikenoue, Simon, S. Saitou, Akutsu

  • Replaced the suspension wires and took the alignment; see here

  • Found we needed some ballast masses to balance and locate the NAB.

Next plan

Wanted!

KAGRA/subgroups/AOS/NarrowAngleBaffles/2018-06-01 (last edited 2018-06-08 17:43:12 by TomotadaAkutsu)