= 20180604 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5198]] == Today's activities == Workers: Ikenoue, Simon, S. Saitou, Akutsu * Prepared the shipping. * Wrapped the NAB and took out from the large clean room of ATC in NAOJ. * There was a level difference of the floor at the large door of the clean room, and we needed to use an engine crane to overcome that. * Brought the wrapped whole suspension to the experiment room by its wheels. * Wrapped by aluminum moisture-proof sheet; input RP-3ANC in it. * Put into a wooden box, and closed the openings with nails. == Next plan == == Wanted! ==